Skip to main content

Poland: Ministry decides to build missing section of A1 motorway

The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe
October 24, 2016 Read time: 2 mins
The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million.

Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction.

The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020.

Earlier this year, 945 Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km between the Zawodzie Junction and Woźniki Junction.

The €108 million project is expected to be opened to traffic in the second half of 2019. The section of motorway is part of the A1 running from Gdansk in the north to the Czech border. It forms part of European Route 75. In addition to the concrete roadway, Strabag will also build the Woźniki Junction as well as bridges and several adjoining local roads.

For more information on companies in this article

Related Content

  • Fourth lane for Rome section of Italy’s A1
    June 28, 2023
    Under the agreement, around 16 hectares of trees will be planted, 3.4km of noise barriers installed and a network of cycle paths will be planned.
  • Atkins sells stake in London’s M25 ring road
    December 14, 2016
    Infrastructure engineering firm WS Atkins sold its stake in London’s M25 orbital road to a consortium of institutional investors for nearly €79 million (£66.3 million). Atkins, a publicly listed UK company, sold to Edge Orbital Holdings 2 Limited and the deal for its minority stake is expected to be complete by March 2017, the end of the financial year, according to a statement by Atkins. In October, the Edge Orbital consortium picked up Skanska’s 40% stake in Connect Plus, which manages the M25. Skanska so
  • Polish expressway project for STRABAG
    October 20, 2021
    STRABAG is working on a new Polish expressway project.
  • Major Polish highway projects being planned
    October 12, 2015
    Work on a series of major road projects is now gathering pace. The Polish General Directorate for National Roads and Motorways (GDDKiA) is signing contracts worth over €753.55 mIllion for the construction of two S7 dual carriageway sections. These will form part of the Gdansk-Warsaw route. Czech firm Metrostav will build the 20km section between Koszwaly and Nowy Dwor Gdanski. And Budimex will construct the 19km section between Nowy Dwor Gdanski and Kazimierzowo.