Skip to main content

Poland: Intercor wins S3 dual carriageway contract

Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
April 2, 2015 Read time: 2 mins
Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway.

The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million).

The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.

The total planned length is 470 km, of which 240km is open to traffic, although some stretches are single carriageway.

Motorway A3 was planned to be built along this route before, but the decision was made to build a lower standard so-called express road because traffic was too low to justify an autostrada.

Most express roads in Poland which are built by upgrading existing roads. But some of the S3 is being built on a new alignment away from the parallel DK3 road it is to replace.

Related Content

  • New dual carriageway for South East Nigeria
    March 11, 2015
    Work is nearing completion on Nigeria’s important East-West road project. The new dual carriageway link should be ready to carry traffic in a matter of months. In all the project was originally expected to cost in the order of US$1.93 billion to construct and work commenced back in 2006. However an additional stretch may now be added that will extend the route. This project is of significance as it improves transport links to the South East of Nigeria, an area of the country that has long been overlooked fo
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Bolivia dual carriageway project stalled
    September 12, 2016
    Work remains at a halt on the 70km dual carriageway upgrade connecting Yapacani with Montero in Bolivia’s Santa Cruz department. A disagreement between the Mexican construction company that was building the link, Tradeco, and Bolivia’s road administration department, ABC, resulted in the contract being cancelled. The route, Highway 4, runs from Yapacani through Santa Fe, San Carlo and Portachuelo to Montero and the project was intended to improve the road and boost its capacity by increasing the number of l
  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.