Skip to main content

Poland: Intercor wins S3 dual carriageway contract

Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
April 2, 2015 Read time: 2 mins
Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway.

The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million).

The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.

The total planned length is 470 km, of which 240km is open to traffic, although some stretches are single carriageway.

Motorway A3 was planned to be built along this route before, but the decision was made to build a lower standard so-called express road because traffic was too low to justify an autostrada.

Most express roads in Poland which are built by upgrading existing roads. But some of the S3 is being built on a new alignment away from the parallel DK3 road it is to replace.

Related Content

  • Action call for ''Britain's worn-our road markings''
    March 2, 2012
    Nearly a third of the length of Britain's single carriageway A roads have white lines so worn out that they do not meet recognised standards, according to the LifeLines Report, an assessment of more than 2,400km miles of the network.
  • M7 expansion on schedule in Hungary
    May 27, 2025
    Project is part of biggest express road upgrade in country's history
  • Poland: €7.57bn road budget call
    February 20, 2012
    The Polish highway authorities are calling for a road budget of e7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow