Skip to main content

Poland: Intercor wins S3 dual carriageway contract

Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
April 2, 2015 Read time: 2 mins
Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway.

The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million).

The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.

The total planned length is 470 km, of which 240km is open to traffic, although some stretches are single carriageway.

Motorway A3 was planned to be built along this route before, but the decision was made to build a lower standard so-called express road because traffic was too low to justify an autostrada.

Most express roads in Poland which are built by upgrading existing roads. But some of the S3 is being built on a new alignment away from the parallel DK3 road it is to replace.

Related Content

  • Tunnel project of Chilean capital Santiago
    April 8, 2015
    Tunnel construction in Chilean capital Santiago will help cut chronic congestion – Mauro Nogarin & Mike Woof write. Chile’s capital Santiago is a thriving city having benefited from the country’s economy growing strongly in recent years. The massive copper mining sector has helped boost the country’s GDP significantly in the past few decades, also aided by the growing international reputation of Chile’s large wine industry. The steady economic growth has resulted in an equally steady growth in average incom
  • Romania tenders for two sections of Pitesti-Sibiu motorway
    May 14, 2018
    Romania’s national road company has tendered two sections of the Sibiu-Pitesti motorway as part of ongoing work to complete the cross-country A1. Out to tender are sections 1 and 5 of the five-section Sibiu-Pitesti route. Romania’s Autostrada A1 will, when completed, will run for nearly 580km to connect Bucharest with the Banat and Crișana regions in the western part of the country. The motorway starts on the outskirts of Bucharest and runs to Pitești, Sibiu, Deva, Timișoara and Arad before crossing the b
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well
  • Colombia dual carriageway concession awarded
    January 29, 2021
    A key Colombian dual carriageway concession has been awarded.