Skip to main content

Poland calls a tender for work on the Biskupia Gorka viaduct

Poland will have to spend around €7.12 billion to complete its section of the trans-European Via Carpathia. Work on the north-south transport corridor could be completed by 2025, the government said during a recent European Economic Congress held in the Polish city of Katowice. The route is planned to run nearly 1,600km from the Lithuanian Baltic Sea port city of Klaipeda to the Greek city of Thessaloniki on the Aegean Sea. It passes through Poland, Slovakia, Hungary, Romania and Bulgaria. It will cross cor
May 25, 2017 Read time: 2 mins
Poland will have to spend around €7.12 billion to complete its section of the trans-European Via Carpathia.


Work on the north-south transport corridor could be completed by 2025, the government said during a recent European Economic Congress held in the Polish city of Katowice.

The route is planned to run nearly 1,600km from the Lithuanian Baltic Sea port city of Klaipeda to the Greek city of Thessaloniki on the Aegean Sea. It passes through Poland, Slovakia, Hungary, Romania and Bulgaria. It will cross corridors leading from Western Europe to Russia and linking through Black Sea ports.

Delays have plagued construction of the route, with only sections completed or upgraded.

Meanwhile, The Polish city of Gdansk has called a tender for reconstruction of the Biskupia Gorka viaduct, named after the city’s suburb.

The project will cost nearly €36 million, of which €27 million will come from European Union funds. Work will start likely by the end of this year.

Related Content

  • Support for Poland’s A1
    July 6, 2012
    The European Investment Bank (EIB) has in total granted a long-term facility of €1.070 billion for the construction of the second phase of the A1 motorway forming part of the priority trans-European transport network connecting the north of Poland (Gdansk) with the Austrian capital Vienna, via the Czech and Slovak Republics. The loan will finance the construction of a 62km section of the A1 motorway between Nowe Marzy and Torun on the basis of a design, build, finance and operate (DBFO) concession. This con
  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Russia’s most expensive road project to commence
    January 15, 2019
    Construction work is being planned for Russia’s most expensive road, which will be built in south of the country – Eugene Gerden reports Work is due to commence shortly on Russia’s most expensive road, in the south of the country. The highway will form part of the existing 1,600km Moscow-Sochi road, according to recent statements from senior officials at the Russian Ministry of Transport as well as local analysts. As part of the project, the Russian Government, together with private investors, plans to