Skip to main content

Poland bidders angry over Astaldi win for Warsaw Ring Road work

Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi
June 18, 2015 Read time: 2 mins
Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority 1361 GDDKiA chose 1324 Astaldi as the winner.

Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, 3976 Porr Polska, Salini Polska and IDS-BUD.

The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports.

World Highways reported in February that Astaldi’s €290 million bid was the lowest offer for the project. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete.

The dispute comes just as an engineering and construction group led by Astaldi signed the largest construction financing package in Turkey’s history – US$5 billion - to refinance existing loans and provide new funding for a $6.4 billion toll road.

Astaldi and its Turkish partners 3338 Nurol Insaat, 3340 Makyol Insaat and Ozaltin Insaat agreed to the loan from nine lenders, including 3321 Deutsche Bank for the 400km road and suspension bridge across the Sea of Marmara. Financial news agency Bloomberg said the loan is the largest for a project in Turkey.

Astaldi said in a written statement that the new financial package will allow completion of the final portion of the 301km route linking the city of Bursa to the Aegean port of İzmir (Phase 2B) and to refinance the sections under construction for the Gebze-Orhangazi-Bursa link (Phase 1 and Phase 2A).

For more information on companies in this article

Related Content

  • Russian bypass projects under construction
    October 5, 2018
    The Russian government is starting a major programme of building bypasses around large cities during the current financial year – Eugene Gerden writes The Russian government is starting a massive programme of building bypasses around the country’s biggest cities during this financial year. The aim is to address the problems of traffic jams and speeding traffic on federal routes, according to recent statements by the Russian Presidential Administration and some senior officials from the Ministry of Trans
  • LiuGong closes Dressta deal
    March 21, 2012
    Chinese manufacturer LiuGong Machinery has finalised its agreement to acquire Polish firm HSW (Huta Stalowa Wola) and its distribution subsidiary, Dressta. The agreement was signed by executives from both companies in Warsaw.
  • New study suggests Fehmarn Belt payback close to 50 years
    October 9, 2015
    A study by Danish consultant Hans Schjær-Jacobsen has shown that the payback period for the proposed Fehmarn Belt Fixed Link tunnel project between Denmark and Germany will be close to 50 years. This is a decade longer than estimated by the developers of the project which focusses on a 17km immersed tunnel, the study noted. The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The 17km tunnel, including two railway tunnels, two motorway tunnels and an
  • Colombia's road plans
    March 22, 2012
    The Colombian authorities have launched 17 road infrastructure tenders worth a total of US$1.89 billion. The tender process is remaining open until 30th January 2012.