Skip to main content

Poland bidders angry over Astaldi win for Warsaw Ring Road work

Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi
June 18, 2015 Read time: 2 mins
Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority 1361 GDDKiA chose 1324 Astaldi as the winner.

Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, 3976 Porr Polska, Salini Polska and IDS-BUD.

The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports.

World Highways reported in February that Astaldi’s €290 million bid was the lowest offer for the project. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete.

The dispute comes just as an engineering and construction group led by Astaldi signed the largest construction financing package in Turkey’s history – US$5 billion - to refinance existing loans and provide new funding for a $6.4 billion toll road.

Astaldi and its Turkish partners 3338 Nurol Insaat, 3340 Makyol Insaat and Ozaltin Insaat agreed to the loan from nine lenders, including 3321 Deutsche Bank for the 400km road and suspension bridge across the Sea of Marmara. Financial news agency Bloomberg said the loan is the largest for a project in Turkey.

Astaldi said in a written statement that the new financial package will allow completion of the final portion of the 301km route linking the city of Bursa to the Aegean port of İzmir (Phase 2B) and to refinance the sections under construction for the Gebze-Orhangazi-Bursa link (Phase 1 and Phase 2A).

For more information on companies in this article

Related Content

  • Last section of Osman Gazi Bridge lifted into place over Izmit Gulf
    May 4, 2016
    The last section of the 3km İzmit Bay Bridge – now officially the Osman Gazi Bridge - was lifted into place on April 21, according to Turkish media. When open later this summer, the bridge will cut the 70-minute drive around İzmit Gulf, on the Sea of Marmara, to just six minutes.
  • Consortium to provide half of US$ 2.70bn for Turkish motorway
    September 27, 2012
    Nurol-Özaltn-Makyol-Astaldi-Yüksel-Göçay consortium says it will provide half of the US$ 2.7 billion required to build Turkey’s new Gebze-Orhangazi-zmir motorway from its own combined funds. The other half of cost will be covered by a bank loan agreement secured by the consortium.
  • Consortium wins third Bosphorus bridge deal
    December 3, 2012
    A consortium formed by ICTAS of Turkey and the Italian firm Astaldi has won a tender to build a third suspension bridge over Istanbul’s Bosphorus. Despite criticism from planners and environmentalists, the 1.3km structure, the longest over the strait, has been given the go-ahead by Turkey’s Transport Minister, Binari Yildirim. A joint venture of local company IC Içtas Insaat and Italian Astaldi has won the tender for the project, and Minister Yildirim is reported as saying the bridge would be built in three
  • Egis has been awarded a major Turkish highway deal
    June 25, 2013
    Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus. OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish