Skip to main content

Poland awards three Expressway S19 sections

The Polish General Directorate for National Roads and Motorways – GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway. A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million. The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by M
March 11, 2017 Read time: 2 mins
The Polish General Directorate for National Roads and Motorways – 1361 GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway.

A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million.

The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by Mota-Engil Central Europe.

Meanwhile, 945 Strabag made the lowest offer of €42 million for the third section stretching between Janow Lubelski Poludnie and Lasy Janowskie.

The 570km Expressway S19 or express road S19 will run from the north-eastern border crossing to Belarus in Kuźnica south through the Polish towns of Białystok, Lublin and Rzeszów, to the border with Slovakia at Barwinek. At Barwinek it will connect with Slovakia’s future R4 expressway.

In February last year, the European Commission approved €150 million for construction of the S19 dual carriageway.

The road is part of TEN-T, the Trans-European Transport Networks. Tent-T is a planned set of road, rail, air and water transport networks in the European Union. A decision to adopt TEN-T was made by the European Parliament and Council in 1996.

TEN-T projects are mostly funded by national or state governments. Other funding sources include European Community funds, loans from international financial institutions such as the European Investment Bank, and private funding.

For more information on companies in this article

Related Content

  • Slovak government stands firm over R2 Expressway, including Soroska Tunnel
    August 11, 2017
    Jan Durisin, head of Slovakia’s motorway operator NDS, has said that the R2 expressway, will go ahead despite watchdog fears of poor value for money. Completion of the R2, that includes the Soroska Tunnel, remains 2024, he told Slovakian news agencies. NDS, he said, will start looking for a contractor to start work in 2018 on a stretch of the expressway near the town of Roznava. R2 is a 360km route that will run from Kosice in the east across the country to Trenčín, near the Czech border in the west. It wil
  • Poland tenders for more A2 work between Lodz and Warsaw
    January 8, 2019
    A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland. According to the Polish General Directorate for National Roads and Motorways (GDDKiA), the cost will be around €139 million with completion set for 2021. The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport
  • Key Polish road contract awarded
    April 16, 2021
    A key Polish road contract has been awarded to Poland.
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the