Skip to main content

Poland awards three Expressway S19 sections

The Polish General Directorate for National Roads and Motorways – GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway. A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million. The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by M
March 11, 2017 Read time: 2 mins
The Polish General Directorate for National Roads and Motorways – 1361 GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway.

A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million.

The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by Mota-Engil Central Europe.

Meanwhile, 945 Strabag made the lowest offer of €42 million for the third section stretching between Janow Lubelski Poludnie and Lasy Janowskie.

The 570km Expressway S19 or express road S19 will run from the north-eastern border crossing to Belarus in Kuźnica south through the Polish towns of Białystok, Lublin and Rzeszów, to the border with Slovakia at Barwinek. At Barwinek it will connect with Slovakia’s future R4 expressway.

In February last year, the European Commission approved €150 million for construction of the S19 dual carriageway.

The road is part of TEN-T, the Trans-European Transport Networks. Tent-T is a planned set of road, rail, air and water transport networks in the European Union. A decision to adopt TEN-T was made by the European Parliament and Council in 1996.

TEN-T projects are mostly funded by national or state governments. Other funding sources include European Community funds, loans from international financial institutions such as the European Investment Bank, and private funding.

For more information on companies in this article

Related Content

  • Poland road tenders being announced
    October 5, 2015
    Polish General Directorate for National Roads and Motorways (GDDKiA) is announcing tenders for the construction of a series of major routes. One key stretch is for a 41km section of the S14 dual carriageway, which will link the A2 highway with the S8 dual carriageway and which will constitute Lodz's western ring-road. According to declarations of the Polish Infrastructure and Development Ministry, work on the S14 project will commence in 2016.
  • EIB lends €900mn for Poland’s S7 and S8 dual carriageways
    December 14, 2012
    Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
  • Poland: Ministry decides to build missing section of A1 motorway
    October 24, 2016
    The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe
  • Poland’s key road projects
    June 6, 2024
    Major road projects are moving ahead in Poland.