Skip to main content

Poland awards three Expressway S19 sections

The Polish General Directorate for National Roads and Motorways – GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway. A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million. The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by M
March 11, 2017 Read time: 2 mins
The Polish General Directorate for National Roads and Motorways – 1361 GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway.

A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million.

The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by Mota-Engil Central Europe.

Meanwhile, 945 Strabag made the lowest offer of €42 million for the third section stretching between Janow Lubelski Poludnie and Lasy Janowskie.

The 570km Expressway S19 or express road S19 will run from the north-eastern border crossing to Belarus in Kuźnica south through the Polish towns of Białystok, Lublin and Rzeszów, to the border with Slovakia at Barwinek. At Barwinek it will connect with Slovakia’s future R4 expressway.

In February last year, the European Commission approved €150 million for construction of the S19 dual carriageway.

The road is part of TEN-T, the Trans-European Transport Networks. Tent-T is a planned set of road, rail, air and water transport networks in the European Union. A decision to adopt TEN-T was made by the European Parliament and Council in 1996.

TEN-T projects are mostly funded by national or state governments. Other funding sources include European Community funds, loans from international financial institutions such as the European Investment Bank, and private funding.

For more information on companies in this article

Related Content

  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.
  • Contracts awarded for key sections of Poland’s S7 route
    June 18, 2015
    Work is starting on Poland’s S7 expressway. Italian firm Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The wo
  • STRABAG wins tricky Polish project
    May 2, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.
  • Ustronie Morskie junction to the ring-road of Koszalin
    November 3, 2015
    Strabag consortium has signed a contract with the Polish General Directorate for National Roads and Motorways (GDDKiA) for construction of an S6 dual carriageway section. The work, worth around US$113 million, is due for completion in April 2019. It also makes Strabag responsible for more than 100km of S6 work. The latest section is from the Ustronie Morskie junction to the ring-road of Koszalin and Sianow. Before the entire S6 route is completed, a contract for Kolobrzeg-Ustronie Morskie section m