Skip to main content

Poland: A1 tender attracts 11 offers, including one from Strabag

Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids. A Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million. A consortium formed by Polaqua and Dragados was the second lowest, at €156.4 million. The highest bid was €183.4 million. The contract calls for a construction period of 30 months. Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion
February 19, 2015 Read time: 1 min
Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids.

A 945 Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million.

A consortium formed by 8002 Polaqua and 4761 Dragados was the second lowest, at €156.4 million.

The highest bid was €183.4 million. The contract calls for a construction period of 30 months.

Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion from the 1116 European Union’s Regional Operational Programme for 2014-20. However, the amount is €700 million less than the last allocation, according to the Marshal, or political leader, of the province Adam Struzik.

He said the lesser allocation is because the region has a high per capita GDP. If the €2.1 billion, around €55.6 million will be spent on roads and around €32.4 million will go to rail projects.

For more information on companies in this article

Related Content

  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
  • Budimex consortium win Poland’s Ostroda ringroad court case
    March 18, 2015
    A district court in the Polish town of Olsztyn has ruled in favour of a consortium of Budimex and Ferrovial Agroman which challenged the awarding of a ringroad contract to a rival. The ruling means that the Salini consortium’s winning bid for the construction of a ringroad around Ostroda is overturned on the basis that it was ineffectually low. This means that the contract will go to the Budimex consortium which proposed to build the road for around €223 million. Polish builder Budimex is the consortium's m
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
  • Poland: tendering for Lodz's Western Ring-Road attracts 17 offers
    February 10, 2017
    The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media. Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction. Budimex has reportedly made the lowest offer in both contract contests. Polish media also reported that €530 million from the European Union’s Cohesi