Skip to main content

Plans for Laos-Vietnam highway

Plans are being drawn up in Laos for the new highway connecting its capital Vientiane with Hanoi, the capital of neighbouring Vietnam. The project is expected to cost in excess of US$4.5 billion, with much of the Laos section of the route running parallel to the existing Road N0 13 South.
May 29, 2018 Read time: 1 min

Plans are being drawn up in Laos for the new highway connecting its capital Vientiane with Hanoi, the capital of neighbouring Vietnam. The project is expected to cost in excess of US$4.5 billion, with much of the Laos section of the route running parallel to the existing Road N0 13 South. The route will be 707km long, crossing the border between Namphao in Laos and Cau Treo in Vietnam. Three potential routes have been evaluated for the highway in Laos and two in Vietnam but the most costly have already been rejected. It now looks as if the route through Borikhamxay Province in Laos is favoured. And for Vietnam, the route through Nghe An Province is seen as more suitable, due in part to its lower cost. Financing for the project has yet to be finalised.

Related Content

  • China helps Nepal plan capital ring road upgrade
    February 24, 2012
    China is providing technical assistance for the upgrading of the 27km ring road project for Nepalese capital Kathmandu.
  • Vietnam considering major new tunnel and highway projects
    March 9, 2018
    Vietnam’s Quang Ninh Province is setting out plans for major infrastructure projects. One project will be for a new tunnel link running under Cua Luc Bay, while the road projects are for the Ha Long-Cam Pha coastal route and the Van Don-Mong Cai Highway. Construction of the 1.3km undersea tunnel project in Ha Long city is now subject to a feasibility study. Construction is expected to commence in 2019.
  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • Japanese funding for Vietnam link
    April 19, 2012
    The Japanese SE Group is working on a new road project in Vietnam. The 25km highway is costing some US$476 million to construct, with some 60% of the funding coming from the JBIC Bank and SE Group providing around 20%. The rest of the funding will be provided by official development assistant capital. This new road will provide a link from the city of Halong in Vietnam's Quang Ninh province to the Hanoi-Haiphong highway project.