Skip to main content

Pilosio improves SlabProp range with the SlabProp 2.0

As part of upgrades to the SlabProp range from Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031). Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity. This prop is made of aluminium type 6005A for a good ca
July 8, 2016 Read time: 2 mins
As part of upgrades to the SlabProp range from 7163 Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised

The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031).

Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity.

This prop is made of aluminium type 6005A for a good capacity-to-weight ratio. Pilosio says that this reduces number of post shores required resulting in labour cost savings. It can also be used as single post shore, in combination with other props one on top of the other to reach greater heights or connected with truss frames to create shoring towers.

The SlabProp 2.0 is totally compatible with Slabform and Liteform panel system.

The range of products also includes a series of extension props to increase the flexibility of the system: lengths are 0.5m up to 1.5m. Connecting frames are available in different lengths, from 75-305cm. They can be attached to the inner tube or to the outer tube. Both sections allow quick connection with the hook.

Bearing towers can be easily assembled flat on the ground.

For more information on companies in this article

Related Content

  • Magni’s RTH 5.39S rotating telescopic handler reaches for the top
    January 6, 2017
    Magni TH developed a rotating telescopic model which is among the highest-reaching in the world. The RTH 5.39S is a medium-size chassis and scissors stabilised. The chassis is the same as the RTH 5.30S and has been reinforced to resist the big stress of working at extreme height. The 38.7tonne machine has a maximum lifting capacity of 2tonnes, allowing a reach of up to 13 floors. The transmission is composed of a Euro 4 final Mercedes Engine with 170kW one Bosch Rexroth hydrostatic piston pump and a Bosc
  • Case’s new mid-excavator marvels unveiled at bauma
    January 6, 2017
    Case says the CX75C SR and CX80C, its new and claimed market first Tier 4 Final emissions standard midi-excavators, offer more performance power and greater operator cabin comfort than previous models. Tier 4 Final requirements are said to have been met through the use of Cooled Exhaust Gas Recirculation (CEGR) combined with a Diesel Oxidation Catalyst (DOC) system. Case says there is no requirement for the two new mid-excavators to have a costly Diesel Particulate Filter (DPF), so there is no need for acti
  • Case’s new mid-excavator marvels unveiled at bauma
    February 7, 2013
    Case says the CX75C SR and CX80C, its new and claimed market first Tier 4 Final emissions standard midi-excavators, offer more performance power and greater operator cabin comfort than previous models. Tier 4 Final requirements are said to have been met through the use of Cooled Exhaust Gas Recirculation (CEGR) combined with a Diesel Oxidation Catalyst (DOC) system. Case says there is no requirement for the two new mid-excavators to have a costly Diesel Particulate Filter (DPF), so there is no need for acti
  • Using aspahlt testing equipment improves efficiency
    May 28, 2013
    From density tests on a Mongolian gold mine project to an all-singing, all-dancing asphalt tester, Kristina Smith reports on some of the latest new products in materials testing. Perhaps understandably, nuclear density gauges can present contractors with some order to move them at all. “One of the problems with nuclear soil gauges is the restrictions on movement,” said John Lamond, Manufacturing. “If you are a contractor projects cross-border, it’s a real challenge to move a nuclear density gauge around.”