Skip to main content

Pilosio improves SlabProp range with the SlabProp 2.0

As part of upgrades to the SlabProp range from Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031). Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity. This prop is made of aluminium type 6005A for a good ca
July 8, 2016 Read time: 2 mins
As part of upgrades to the SlabProp range from 7163 Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised

The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031).

Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity.

This prop is made of aluminium type 6005A for a good capacity-to-weight ratio. Pilosio says that this reduces number of post shores required resulting in labour cost savings. It can also be used as single post shore, in combination with other props one on top of the other to reach greater heights or connected with truss frames to create shoring towers.

The SlabProp 2.0 is totally compatible with Slabform and Liteform panel system.

The range of products also includes a series of extension props to increase the flexibility of the system: lengths are 0.5m up to 1.5m. Connecting frames are available in different lengths, from 75-305cm. They can be attached to the inner tube or to the outer tube. Both sections allow quick connection with the hook.

Bearing towers can be easily assembled flat on the ground.

For more information on companies in this article

Related Content

  • Wirtgen introducing new concrete paver range
    March 3, 2015
    Wirtgen is introducing a new concrete paver range, the SP90 series. These models will replace the existing SP80 series as well as the SP850. Four basic models have been announced at present, the SP92, SP92i, SP94 and SP94i, although with the range of options and features available, the capabilities offered will be extensive. Paving widths for the machines now range from 2-9.5m, increasing the maximum width and allowing these units to handle a wider array of slipforming tasks than the earlier SP80 Series mod
  • Engine/component efficiencies are top bill
    May 25, 2016
    Driveline specialist Dana is developing a full connectivity suite for its transmissions, axles and other driveline components. The Dana Spicer Smart Suite collects, manages, analyses, communicates and acts on data from the complete drivetrain, including load and condition monitoring, torque management, speed sensing and steering sensing. This provides critical alerts and allows the operator to react to operational changes, boosting productivity and safety. “As the construction market becomes more comp
  • Sandvik tunnelling equipment boosts Sochi 2014
    August 28, 2013
    Sandvik Construction is among leading equipment manufacturers playing a key role in building a network of road and rail tunnels on one new and one existing transport route in and around the Russian coastal city of Sochi as part of a US$47.75 billion investment in preparations for the Sochi 2014 Winter Olympics. Guy Woodford reports Sandvik Construction’s tunnelling equipment team in Russia have been very much in demand over the past three years. Since 2010, they have been overseeing the seven Russian c
  • Bolivia’s latest highway project is underway
    May 29, 2018
    Bolivia’s new highway project will improve connections with Brazil and Chile – Mauro Nogarin reports. Work is underway on Bolivia’s new Rurrenabaque – Riberalta highway project, which will boost connectivity for the country. The project is being coordinated by the Bolivian Highway Administration (ABC), with an Eximbank loan of US$579.4 million providing the financing for 85% of the work. The remaining 15% of the funding will come from the Beni Department’s budget, where the route is being built. Located in