Skip to main content

Philippines to rethink Laguna Expressway highways work

The Philippines might separate a 47km six-lane road construction element from a complicated land reclamation and dike development contract recently shunned by preferred bidders. None of the three qualified bidders for the Laguna Lakeshore Expressway Dike public-private partnership deal submitted final bids for the contract. There were concerns over the legality of reclaiming 700 ha of land and whether investors could make money from it.
May 3, 2016 Read time: 2 mins

The Philippines might separate a 47km six-lane road construction element from a complicated land reclamation and dike development contract recently shunned by preferred bidders.

None of the three qualified bidders for the Laguna Lakeshore Expressway Dike public-private partnership deal submitted final bids for the contract. There were concerns over the legality of reclaiming 700 ha of land and whether investors could make money from it.

The pre-qualified consortia were Trident Infrastructure and Development consortium – consisting of SM Prime Holdings, Megaworld, Ayala Land and Aboitiz Equity Ventures - the Alloy-PAVI LLEDP Consortium and San Miguel Holdings

Work was to have included 700 ha of coastal reclamation of Laguna de Bay from Taguig in Metro Manila to Calamba and Los Baños in Laguna, as well as associated bridges, pumping stations and ancillary flood gates.

The expressway was to have coast around $860 million, according to some estimates. It was expected to reduce travel time between Metro Manila and Laguna from 90 minutes to 35 minutes, and ease traffic and mitigate flooding between Taguig and Los Baños.

Bidding had been delayed several times due to environmental concerns, including how the project might displace local fishing boats from their harbours and fishing grounds.

Leading the review of the unwanted contract is the Department of Public Works and Highways.

Business World On-Line quoted Andre Palacios, executive director of the Public-Private-Partnership Center, saying the government department is rethinking which components of the discredited contract might go together. There is a possibility that the road work is hived off.

Related Content

  • Elevated highway planned for Philippines
    February 23, 2017
    Proposals have been put forward for an innovative elevated highway stretch in the Philippines. The proposed route would run from the Delpan Bridge in the capital Manila, across the Pasig River and on to the Napindan Bridge in Taguig. The plans have been suggested by the construction firm AKH General Contractor. In addition to carrying two lanes for traffic in either direction, the 22km elevated highway would also provide a rapid transit system. Called the Integrated Viaduct and Personal Rapid Transit System
  • Merseylink wins US$3.12bn Mersey Gateway Project contract
    June 20, 2013
    Merseylink was today announced as the preferred bidder for the US$3.12 billion (£2bn) Mersey Gateway Project in North West England. Making the announcement together in the observatory in the Catalyst Museum in Widnes overlooking the River Mersey, Halton Borough Council and Merseylink also confirmed they have jointly identified savings amounting to “tens of millions of pounds” on the projected public sector contribution to the project budget.
  • Interest is strong in Chile’s Chacao bridge project
    October 18, 2012
    Strong interest is being shown in the project to build the new Chacao Bridge in Chile. The country’s Ministry of Public Works has said that 41 companies have bought details of the terms and conditions for the tender to build the bridge. Around 70% of the firms interested come from outside Chile. The bridge will be located in Chiloe and is expected to cost in the region of US$740 million to construct. Chile’s Ministry of Public Works hopes that additional firms will purchase the tender details before the dea
  • Philippines bridge project awarded
    December 11, 2017
    A US$403 million contract for a cable-stayed bridge in the Philippines has been awarded. The design and build deal for the 8.2km bridge will be handled by a joint venture team comprising Acciona Construccion, First Balfour and DM Consunji. The partnership is called the Cebu Link Joint Venture and should complete work on the link, which connects Cebu with Cordova, in 2021. The contract was awarded by the Cebu Cordova Link Expressway, a subsidiary of Metro Pacific Tollways. Included in the contract is the