Skip to main content

Philippines: Laguna Expressway and Dike Project fails to get bids

Construction of a major 47km highway and sea protection dike development in Manila has been thrown into doubt after no bids were received for the US$2.65 billion contract. Philippines media report that the Department of Public Works and Highways declared the auction for the six-lane Laguna Expressway Dike Project a failure after the three pre-qualified bidders didn’t submit bids. The pre-qualified consortia were Trident Infrastructure and Development consortium – consisting of SM Prime Holdings, Megaw
March 30, 2016 Read time: 3 mins
Construction of a major 47km highway and sea protection dike development in Manila has been thrown into doubt after no bids were received for the US$2.65 billion contract.

Philippines media report that the Department of Public Works and Highways declared the auction for the six-lane Laguna Expressway Dike Project a failure after the three pre-qualified bidders didn’t submit bids.

The pre-qualified consortia were Trident Infrastructure and Development consortium – consisting of SM Prime Holdings, Megaworld, Ayala Land and Aboitiz Equity Ventures - the Alloy-PAVI LLEDP Consortium and San Miguel Holdings

Work was to have included 700 ha of coastal reclamation of Laguna de Bay from Taguig in Metro Manila to Calamba and Los Baños in Laguna, as well as associated bridges, pumping stations and ancillary flood gates.

The expressway was to have coast around $860 million, according to some estimates. It was   expected to reduce travel time between Metro Manila and Laguna from 90 minutes to 35 minutes, and ease traffic and mitigate flooding between Taguig and Los Baños.

Failure of the tender is the latest issue for what was to have been the largest public-private partnership project ever in the Philippines. Bidding has been delayed several times due to environmental concerns, including how the project might displace local fishing boats from their harbours and fishing grounds.

Business World On Line reported that San Miguel Holdings had sent reporters a message saying that the Laguna project “is just not feasible”. The government “will have to re-examine its assumptions and redesign a mutually beneficial contract best suited for a deal as large and complex as this one”.

A spokesperson for Trident Infrastructure said the “risk-reward balance is not in favour of the bidders”, with private sector taking on too much risk. “Frankly, from an economic viability perspective and a risk allocation perspective, we found that the government wouldn’t provide a concession agreement that will address all the concerns of the private sector.”

The executive director of the Public Private Partnership Centre, Andre Palacios, told reporters that it may take another national election before the project can be revisited. “For Lakeshore [Laguna], I doubt if we can do another bidding within this administration,” he said.

Meanwhile, the Department of Public Works and Highways said bid documents will be released in mid-April for an 8km elevated toll road worth nearly $388 million that will link the southern and northern parts of Metro Manila. The auction will allow the right of Metro Pacific Investments Corp (MPIC) to be challenged by other competitors.

Related Content

  • Philippines government allows development of two roads
    May 30, 2012
    Proposals to link the South Luzon Expressway (SLEx) and North Luzon Expressway (NLEx) have been approved by the government of the Philippines. The proposals came from Citra Metro Manila Tollways (Citra) and Metro Pacific Investments Corp (MPIC). Citra intends to develop a US$580.64million six-lane elevated tollway stretching 14km. A US$525.2million four-lane elevated expressway that stretches 13.4km could also be developed by MPIC. Work on one or both of the projects will begin later this year, with complet
  • Major road projects for Philippines planned
    September 11, 2015
    A series of major highway infrastructure projects are planned for the Philippines. Plans are in hand for the Cavite-Laguna Expressway (CALAX) project, with MPCALA Holdings calling on the authorities to give final approval so that construction can commence before 2017. MPCALA Holdings is a subsidiary of conglomerate Metro Pacific Investments (MPIC) and won the 35-year contract to build, operate and maintain the CALAX in June 2015. The CALAX project is worth US$754.6 million. At present, the company is lookin
  • Philippines expressway extension project
    January 2, 2019
    In the Philippines, a proposal has been made for the Tarlac-Pangasinan-La Union Expressway (TPLEx) to be extended. The US$441.6 million project is for a 59.4km extension to the TPLEx route. The proposal has been put forward by San Miguel Corp (SMC). The highway extension would help improve transportation to the north of Manila, the capital of the Philippines. The work would extend the route to San Juan from Rosario. The work would be carried out in three stages, with one 18.4km section between San Juan and
  • DMCI set to be involved in key Philippines expressways’ link project
    August 7, 2012
    DMCI Holdings (DMCI) of the Philippines, in partnership with the San Miguel Corporation, is expected to carry out a road project to link two major expressways in the country. The link is part of road projects valued at US$901.65 million (PHP 38 billion) that Metro Pacific Tollways intends to carry out over the next five years. DMCI was the contractor for the second phase of the 30km Metro Manila Skyway project, through its construction unit, DM Consunji. The second phase of the Skyway project involved build