Skip to main content

Philippines: Laguna Expressway and Dike Project fails to get bids

Construction of a major 47km highway and sea protection dike development in Manila has been thrown into doubt after no bids were received for the US$2.65 billion contract. Philippines media report that the Department of Public Works and Highways declared the auction for the six-lane Laguna Expressway Dike Project a failure after the three pre-qualified bidders didn’t submit bids. The pre-qualified consortia were Trident Infrastructure and Development consortium – consisting of SM Prime Holdings, Megaw
March 30, 2016 Read time: 3 mins
Construction of a major 47km highway and sea protection dike development in Manila has been thrown into doubt after no bids were received for the US$2.65 billion contract.

Philippines media report that the Department of Public Works and Highways declared the auction for the six-lane Laguna Expressway Dike Project a failure after the three pre-qualified bidders didn’t submit bids.

The pre-qualified consortia were Trident Infrastructure and Development consortium – consisting of SM Prime Holdings, Megaworld, Ayala Land and Aboitiz Equity Ventures - the Alloy-PAVI LLEDP Consortium and San Miguel Holdings

Work was to have included 700 ha of coastal reclamation of Laguna de Bay from Taguig in Metro Manila to Calamba and Los Baños in Laguna, as well as associated bridges, pumping stations and ancillary flood gates.

The expressway was to have coast around $860 million, according to some estimates. It was   expected to reduce travel time between Metro Manila and Laguna from 90 minutes to 35 minutes, and ease traffic and mitigate flooding between Taguig and Los Baños.

Failure of the tender is the latest issue for what was to have been the largest public-private partnership project ever in the Philippines. Bidding has been delayed several times due to environmental concerns, including how the project might displace local fishing boats from their harbours and fishing grounds.

Business World On Line reported that San Miguel Holdings had sent reporters a message saying that the Laguna project “is just not feasible”. The government “will have to re-examine its assumptions and redesign a mutually beneficial contract best suited for a deal as large and complex as this one”.

A spokesperson for Trident Infrastructure said the “risk-reward balance is not in favour of the bidders”, with private sector taking on too much risk. “Frankly, from an economic viability perspective and a risk allocation perspective, we found that the government wouldn’t provide a concession agreement that will address all the concerns of the private sector.”

The executive director of the Public Private Partnership Centre, Andre Palacios, told reporters that it may take another national election before the project can be revisited. “For Lakeshore [Laguna], I doubt if we can do another bidding within this administration,” he said.

Meanwhile, the Department of Public Works and Highways said bid documents will be released in mid-April for an 8km elevated toll road worth nearly $388 million that will link the southern and northern parts of Metro Manila. The auction will allow the right of Metro Pacific Investments Corp (MPIC) to be challenged by other competitors.

Related Content

  • Statistics important to assessment of transport projects
    April 13, 2012
    IRF Geneva's statistics guru, Cristian Gonzalez, explores the growing importance of data in public and private assessments of transport projects IRF's work on statistics is rarely in the limelight. It is, however, an essential component of the federation's key advocacy role on behalf of its members. Statistics are, indeed, a vital function of authoritative lobbying and knowledge sharing on the range of issues impacting our sector - from highlighting the persuasive economic business cases for investment in
  • A consortium has won the deal to build and operate Mexico’s 107km-long Tuxpan-Tampico highway
    October 2, 2014
    In Mexico a consortium headed by Moto-Engil has won the contract to build and operate the 107km-long Tuxpan-Tampico highway. According to Business News Americas, the winning bid that included a works cost of US$260 million, a subsidy of $95 million and venture capital of $73 million. Mota-Engil will now have construct the 107km of highway from Tuxpan to Ozuluama, and then maintain and operate it for the next 30 years. The Tuxpan-Tampico highway links two of Mexico's busiest Gulf coast ports and will be the
  • Honduras tourist tool road project
    April 27, 2015
    In Honduras plans are being drawn up for the tourism corridor tollroad project. This route will connect the cities of San Pedro Sula, La Barca, El Progreso, Tela, and La Ceiba port on the Atlantic Coast, reports Business News Americas. The project has made another move forward as it has received support from the Multilateral Investment Guarantee Agency (Miga). The 200km road project has been awarded to the consortium Autopistas del Atlántico. The aim of the project is to increase economic activity and tran
  • Construction commencing for new tollway for Philippines
    July 18, 2019
    Construction work is commencing on the project to build a new expressway link in the Philippines. The new road section will link the South Luzon Expressway (SLEx) and the North Luzon Expressway (NLEx). The project is costing nearly US$430 million to build and should be ready by 2021. The route will be 8km in length and will feature two lanes in either direction, reducing journey times considerably between the SLEx and the NLEx routes. The work is being carried out for Metro Pacific Tollways (MPTC).