Skip to main content

Philippines: Laguna Expressway and Dike Project fails to get bids

Construction of a major 47km highway and sea protection dike development in Manila has been thrown into doubt after no bids were received for the US$2.65 billion contract. Philippines media report that the Department of Public Works and Highways declared the auction for the six-lane Laguna Expressway Dike Project a failure after the three pre-qualified bidders didn’t submit bids. The pre-qualified consortia were Trident Infrastructure and Development consortium – consisting of SM Prime Holdings, Megaw
March 30, 2016 Read time: 3 mins
Construction of a major 47km highway and sea protection dike development in Manila has been thrown into doubt after no bids were received for the US$2.65 billion contract.

Philippines media report that the Department of Public Works and Highways declared the auction for the six-lane Laguna Expressway Dike Project a failure after the three pre-qualified bidders didn’t submit bids.

The pre-qualified consortia were Trident Infrastructure and Development consortium – consisting of SM Prime Holdings, Megaworld, Ayala Land and Aboitiz Equity Ventures - the Alloy-PAVI LLEDP Consortium and San Miguel Holdings

Work was to have included 700 ha of coastal reclamation of Laguna de Bay from Taguig in Metro Manila to Calamba and Los Baños in Laguna, as well as associated bridges, pumping stations and ancillary flood gates.

The expressway was to have coast around $860 million, according to some estimates. It was   expected to reduce travel time between Metro Manila and Laguna from 90 minutes to 35 minutes, and ease traffic and mitigate flooding between Taguig and Los Baños.

Failure of the tender is the latest issue for what was to have been the largest public-private partnership project ever in the Philippines. Bidding has been delayed several times due to environmental concerns, including how the project might displace local fishing boats from their harbours and fishing grounds.

Business World On Line reported that San Miguel Holdings had sent reporters a message saying that the Laguna project “is just not feasible”. The government “will have to re-examine its assumptions and redesign a mutually beneficial contract best suited for a deal as large and complex as this one”.

A spokesperson for Trident Infrastructure said the “risk-reward balance is not in favour of the bidders”, with private sector taking on too much risk. “Frankly, from an economic viability perspective and a risk allocation perspective, we found that the government wouldn’t provide a concession agreement that will address all the concerns of the private sector.”

The executive director of the Public Private Partnership Centre, Andre Palacios, told reporters that it may take another national election before the project can be revisited. “For Lakeshore [Laguna], I doubt if we can do another bidding within this administration,” he said.

Meanwhile, the Department of Public Works and Highways said bid documents will be released in mid-April for an 8km elevated toll road worth nearly $388 million that will link the southern and northern parts of Metro Manila. The auction will allow the right of Metro Pacific Investments Corp (MPIC) to be challenged by other competitors.

Related Content

  • Growth coming for Asian construction market
    September 4, 2018
    A new report produced by research specialist GlobalData predicts continued growth for Asia’s construction market. According to the report, construction in the ASEAN region will grow by over 6% annually over next five years. The report has been published to coincide with the INTERMAT ASEAN 2018 and Concrete Asia 2018 trade shows for construction, infrastructure and concrete sectors. The data suggests that construction output in the member states of the Association of South-East Asian Nations (ASEAN) would ex
  • Taiwan bureau threatens Kuo Teng over its Kinmen Bridge work
    June 2, 2016
    Taiwan’s National Expressway Engineering Bureau said it would terminate its contract with Kuo Teng Construction company because of issues over the construction schedule of Kinmen Bridge. Work on the bridge connecting the main island of Greater Kinmen and Lieyu, also known as Little Kinmen, began in 2013 after it had been a campaign promise in five presidential elections. The bureau recently said that work on the bridge was nearly 19% behind schedule and reportedly gave the company 30 days to bring the pro
  • Indonesia’s Trans-Sumatra highway inches ahead
    March 11, 2015
    Indonesia will form a consortium of state enterprises to build all the 2,700km of the Trans-Sumatra toll highway, from Lampung to Aceh on the island of Sumatra. The finance department is also setting up special infrastructure banks to provide flexible loans for the state departments to fund the project, Indonesian media reported. Indonesia recently changed the law that had the state infrastructure company PT Hutama Karya as the only organisation allowed to build major projects. Other state enterprises can n
  • Canada: Champlain Bridge deal awarded to SNC-Lavalin consortium
    April 17, 2015
    The Canadian government has awarded a multi-billion dollar contract for the Champlain Bridge in Montreal, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal worth between US$2.5-$4.1 billion. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms Dragados Canada and ACS Infrastructures and the US firm Flatiron Construction. Other