Skip to main content

PBDiM and Gulermak start on Warsaw's ring road

Work has started on the 18.5km southern ring road around the Polish capital Warsaw.
June 26, 2017 Read time: 1 min

Work has started on the 18.5km southern ring road around the Polish capital Warsaw.

The €1.54 billion project runs between Pulawska and Lubelska and should be finished by mid 2020, said Andrzej Adamczyk, Poland’s construction and infrastructure minister.

A consortium formed by the Polish Przedsiebiorstwo Budowy Drog i Mostow (PBDiM) and the Turkish Gulermak is completing the work.

Meanwhile, a stretch of the S7 dual carriageway between Nidzica and Napierki was recently opened. The €118.8 million project involved two sections of road, with 945 Strabag the contractor for the first part and Strabag Infrastruktura Poludnie for the second.

Part of the new road forms a bypass for the town of Nidzica.

Another Polish city, Tychy in Upper Silesia, said it will borrow just over €37 million from the 1054 European Investment Bank as part of the Upper Silesia urban framework programme.

Under the programme, the EIB is to provide financing to support infrastructure development, including roads, in the region.

For more information on companies in this article

Related Content

  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • Poland: Budimex picks up S3 express road work near Lubin
    December 18, 2014
    The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,
  • Kazakhstan’s London road show woos consortia for Almaty ring road
    March 2, 2015
    Kazak and EBRD officials visited London to highlight the possibility of a public-private partnership under the country’s revised PPP legal framework. David Arminas reports. To build a road, you go on the road, and that is what Kazakhstan did in London in mid-December. Representatives of more than 100 organisations, a mix of construction companies and financial institutions, attended the roadshow-style presentation to attract foreign capital for BAKAD, the Almaty Ring Road Concession. The message was that Ka
  • BAM and Iridium get the green light Ross link road in Ireland
    December 15, 2014
    The BAM PPP PGGM and Iridium consortium has been named preferred bidder for the N25 New Ross Bypass project in the Irish Republic. The US$270 million (€217 million) contract - Design, Build, Finance, Maintain and Operate - involves 13.6 km of dual carriageway on the N25 and N30 routes and 1.2 km of the carriageway New Ross N30 route. Construction is expected to support around 300 jobs across Ireland and will be undertaken by a joint venture of BAM Civil and civil engineering firm Dragados. The road will