Skip to main content

Paraguay road tender opening

The tender process for the second section of Paraguay’s bi-oceanic highway project is commencing in mid-2019. This 573km stretch of highway is being offered in two sections, with financing likely to come from international banks. The consortium Consorcio Corredor Vial Bioceanico is handling the first section of the project, which is costing around US$443.4 million. The second section of the route is expected to cost $800 million. The third stretch of the route will be complex as it includes a new bridge spa
March 18, 2019 Read time: 1 min

The tender process for the second section of Paraguay’s bi-oceanic highway project is commencing in mid-2019. This 573km stretch of highway is being offered in two sections, with financing likely to come from international banks. The consortium Consorcio Corredor Vial Bioceanico is handling the first section of the project, which is costing around US$443.4 million. The second section of the route is expected to cost $800 million. The third stretch of the route will be complex as it includes a new bridge spanning the Paraguay River and connecting Carmelo Peralta with Murtinho in Brazil.

Related Content

  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • Singapore road tender opening
    June 10, 2019
    Singapore is opening the tender process for a major road project. The tender is for the construction and design of a section of the North South Corridor (Viaduct). This new link will connect Yishun Avenue 5 and SG Seletar. The tender process is being handled by Singapore’s Land Transport Authority. The closing date for the tender is 29th August, 2019. When fully complete in 2026, this highway will measure 21.5km in length.
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t