Skip to main content

Norwegian bridge faces questions

The cost of the planned bridge connecting Sotra Island to mainland Norway may be considerably higher than originally anticipated. The project could cost as much as €1.78 billion to carry out, which includes building the necessary road links and tunnel sections. With the concession for the bridge being planned as a 20-year package, there is concern that this will not be a viable deal for Norwegian firms. Construction is intended to be complete by 2026. A number of international firms have expressed an intere
October 16, 2019 Read time: 1 min

The cost of the planned bridge connecting Sotra Island to mainland Norway may be considerably higher than originally anticipated. The project could cost as much as €1.78 billion to carry out, which includes building the necessary road links and tunnel sections. With the concession for the bridge being planned as a 20-year package, there is concern that this will not be a viable deal for Norwegian firms. Construction is intended to be complete by 2026. A number of international firms have expressed an interest in the project.

The bridge would be built alongside the existing suspension bridge, which was completed in 1971 and is 1.2km long. The existing bridge handles 22,700 vehicles/day, with this figure expected to grow to 26,000 vehicles by 2024.

Related Content

  • Zimbabwe highway project linking with its neighbours
    November 28, 2016
    Zimbabwe’s Beitbridge to Chirundu highway link now looks set for a complete upgrade. The project has been planned for over 10 years but has faced a series of setbacks and delays, with funding having proved one of the biggest stumbling blocks in the past. The 897km highway runs from Beitbridge, located on the border with South Africa in the south of Zimbabwe all the way up to Chirundu, which is just over the border with Zambia in the north. The route includes part of the A4 highway in the south and the A1 hi
  • Norway road project sees cost reduction
    October 25, 2017
    New technology now looks likely to reduce the cost of Norway’s massive Ferry Free E39 road project. The work had originally been expected to come with a price tag of as much as €36.47 billion (NOK 340 billion) when the plans were announced in early 2016. According to the Norwegian Public Roads Administration (Statens vegvesen), the crossing over the Bjørnafjorden is now likely to be €858.1 million (NOK 8 billion) less costly
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b