Skip to main content

Norway’s E18 Lysaker-to-Ramstadsletta project faces funding issue

A lack of financing is jeopardising construction of the new E18 highway between Lysaker and Asker on the outskirts of Oslo. Media reports say that the Norwegian Road Administration (Statens Vegvesen) has received no funding for the project that is scheduled to start next year. The first phase of the project, between Lysaker and Ramstadsletta, has been scheduled for 2019-2024. Around 90,000 vehicles use the existing E18 road, a local thoroughfare. The new E18 will include cycle paths, pedestrian ways a
December 20, 2018 Read time: 2 mins

A lack of financing is jeopardising construction of the new E18 highway between Lysaker and Asker on the outskirts of Oslo.

Media reports say that the Norwegian Road Administration (Statens Vegvesen) has received no funding for the project that is scheduled to start next year.

The first phase of the project, between Lysaker and Ramstadsletta, has been scheduled for 2019-2024. Around 90,000 vehicles use the existing E18 road, a local thoroughfare. The new E18 will include cycle paths, pedestrian ways and be underground through several communities.

The risk of delay is due to disagreement between the Norwegian Parliament, local politicians in Oslo and the county of Akershus about road tolls. Svein Røed, project director, reportedly said that costs will increase significantly if the project has to be restarted at a later stage.

The 5km Ramstadsletta-to-Slependen section of the E18 is planned 2024-2029, according to Statens Vegvesen, and is part of the overall development of the West Corridor.

Related Content

  • Bosnia gets EBRD loan for Corridor 5c work
    January 8, 2024
    The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
  • SSL settles legal issues, Champlain Bridge to open December 21
    April 18, 2018
    Montreal will get its new Champlain Bridge just before Christmas, a date agreed upon by the Canadian government and the SNC-Lavalin-led consortium. The agreement settles an outstanding lawsuit that the Consortium had filed regarding costs increases of around US$186.5 million relating to the transportation of oversized parts and delays to the bridge's construction, according to media reports. Last month SNC-Lavalin, head of the Signature on the Saint-Laurent Group (SSL), had said that the bridge over the
  • Kenya develops annuity road funding model
    May 8, 2015
    Kenya is introducing novel methods for funding its necessary road infrastructure development - Shem Oirere writes. Kenya has unveiled a new financing model for road construction and reviewed its design standards and construction methodologies, which forms part of a new strategy for the East African country. Under this new plan Kenya is planning to upgrade 10,000km of road, with these links featuring asphalt surfacing; the work being carried out over the next five years at a cost of US$2.8 billion. Despite t
  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.