Skip to main content

North East UK’s A19 /A1058 Coast Road triple-deck junction opens

More than 80,000 drivers a day are now using the recently opened and - first ever - North Tyneside triple-deck highway junction in the northeast. England’s A19 /A1058 Coast Road junction improvement scheme, being done for the client Highways England, was opened on time. However, there will be some overnight closures in the next several weeks to complete the landscaping, traffic light and footpath work. A time capsule has been buried on site and is due to be opened in 2118. Work started in June 2016 on
April 5, 2019 Read time: 2 mins
Triple-deck junction: the UK’s North Tyneside A19/A1058 Coast Road improvement scheme opens
More than 80,000 drivers a day are now using the recently opened and - first ever - North Tyneside triple-deck highway junction in the northeast.


England’s A19 /A1058 Coast Road junction improvement scheme, being done for the client 8100 Highways England, was opened on time. However, there will be some overnight closures in the next several weeks to complete the landscaping, traffic light and footpath work. A time capsule has been buried on site and is due to be opened in 2118.

Work started in June 2016 on the North Tyneside project. The recent opening comes less than two weeks after a €146 million Highways England scheme got underway to improve congestion and reduce journey times on the A19 in South Tyneside.

Drivers will no longer have to negotiate the roundabout and can continue straight on along the A19, said project manager Julie Alexander, who works for the government agency and client Highways England.

The entire North Tyneside junction has been resurfaced and more than 580 concrete rotary piles have been installed to support the structures. Also, 55 concrete bridge beams weighing up to 76 tonnes and over 23m in length have created the base for the three new road bridges. Two pedestrian and cyclist bridges also have been created.

The upgrade is part of the UK government’s €17.5 billion roads investment strategy to improve the intercity road network.

For more information on companies in this article

Related Content

  • New UK dual carriageway opening
    December 20, 2016
    Drivers in the UK are to benefit from the opening of a new dual carriageway connection. The section of road is a key route for Highways England, improving the connection between junction 19 of the M6 and junction 7 of the M56 motorways. The new A556 Knutsford to Bowdon link road will cut congestion and journey times for drivers in the area. As part of the £192 million project to build the new dual carriageway between, Highways England has remodelled slip roads at Yarwood Heath and Bowdon roundabouts. The
  • Highways England to upgrade Winchester M3 junction
    July 5, 2019
    Highways England has unveiled plans to upgrade to one of the busiest motorway junctions in southern England near the town Winchester. Under the plans, junction 9 - the Winchester junction where the M3 interchanges with the A34 trunk road - will be redesigned to create dedicated free flow lanes. This goal is to allow drivers travelling between the M3 and the A34 to travel freely between the two roads to avoid using the junction roundabout. The M3 is the main road between London and the Solent Ports or
  • Minister gives green light for UK road schemes
    May 8, 2012
    Roads Minister Mike Penning yesterday gave the green light for development work to be carried out on six new major UK road schemes. The development work, which will take place over the next three years, aims to prime the road schemes for completion in the early years of the next spending review period (post 2015). The six proposed road schemes, which aim to boost economic growth as part of the Government’s National Infrastructure Plan, are:
  • Greater Manchester's smart motorway M60 now fully-operational
    August 6, 2018
    Drivers using the M60 in the greater Manchester area now using the region’s first smart motorway, according to Highways England. The technology, which went line on July 31 on the final M60 section, includes electronic signs to guide drivers along at a variable but steady speed. Other technology includes an extra running lane in each direction along the M62 between junction 18 and junction 20 and CCTV cameras. The removal of narrow lanes and completion of the project will allow key sections of the M60