Skip to main content

New York governor aims to freeze Thruway tolls, including Tappaen Zee Bridge

The governor of the US state New York, Andrew Cuomo, said he wants to spend US$22 billion over the next five year on maintaining aging roads and bridges. Cuomo also wants to give the agency responsible for maintaining the state’s major cross-state tolled freeway, the 920km Thruway, $1 billion so the agency – New York State Thruway Authority - can freeze tolls at their current rate until 2020. US media reported that his plan would also eliminate tolls for agricultural traffic. He would also offer a t
January 11, 2016 Read time: 2 mins
The governor of the US state New York, Andrew Cuomo, said he wants to spend US$22 billion over the next five year on maintaining aging roads and bridges.

Cuomo also wants to give the agency responsible for maintaining the state’s major cross-state tolled freeway, the 920km Thruway, $1 billion so the agency – New York State Thruway Authority - can freeze tolls at their current rate until 2020.

US media reported that his plan would also eliminate tolls for agricultural traffic. He would also offer a tax credit worth 50% of tolls paid by passenger vehicles using the EZ Pass, a regional electronic toll collection system that can be used throughout New York State.

“It will make a real difference in people’s pockets,” Cuomo said. “It will make a difference in commuters’ pockets. It will make a difference in the pockets of businesses, and it will make yet another very loud statement to businesses that upstate New York is the place to do business.”

The toll freeze would also apply to the new $3.9 billion Tappan Zee Bridge, officially called the New New York Bridge. Like the old bridge, the new twin-span bridge is owned by the New York State Thruway Authority. It is part of the Thruway and is being constructed parallel to the existing old cantilever Tappen Zee Bridge that spans the Hudson River between Westchester and Rockland counties. The eastbound toll on the existing span is $5 but the state government has not said how much the toll will be on the new bridge when it opens in 2017.

Cuomo’s office said $700 million of the new $1 billion proposal would go toward Thruway infrastructure. It did not specify how much of that would be for Tappan Zee Bridge construction costs.

The state budget will be decided in April.

Meanwhile, construction continues on the new bridge. The agency recently reported that the I Lift NY “super crane” has been placing large girder assemblies across the river, averaging two placements a week. Around 50km of steel girders weighing more than 100,000 tons in total will eventually be installed. The bridge’s towers will rise nearly 130m about the river.

Related Content

  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • International firms compete in US bridge project tenders
    May 2, 2012
    The Spanish construction firm ACS is tendering for the construction and operation of four bridges in the US. The firm is tendering in partnership with some other US and international firms for some of the projects, which are worth a total of US$11.4 billion. The Tappan Zee project is expected to cost $5 billion and the deal will be for a design and construction contract. The bridge will be located in New York, is being developed by New York State Thruway Authority and will require two, four-carriageway brid
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop
  • Cable works starts on Gordie Howe Bridge
    February 10, 2023
    The tolled six-lane bridge over the Detroit River, between Windsor in Canada and Detroit in the US, is costing around US$4.2 billion with an opening date likely in 2025.