Skip to main content

New Volga bridge crossing in Russia

The government of the Saratov region (Volga) is considering building another bridge over the Volga River between Saratov and Engels. No details of the project have been released but media reports suggest it will be built under a public-private partnership. According to Nikolay Churikov, the minister of transport and roads for the Saratov region, the project could cost as much as nearly US$764 million. Saratov is a city and the administrative centre of Saratov Oblast and a major port on the Volga River. T
June 9, 2015 Read time: 2 mins
The government of the Saratov region (Volga) is considering building another bridge over the Volga River between Saratov and Engels.

No details of the project have been released but media reports suggest it will be built under a public-private partnership. According to Nikolay Churikov, the minister of transport and roads for the Saratov region, the project could cost as much as nearly US$764 million.

Saratov is a city and the administrative centre of Saratov Oblast and a major port on the Volga River. The city is upstream of Volgograd and has a population or around 840,000, according to a 2010 census.

Engels is a port city on the Volga River and directly across from Saratov to which it has been connected by a bridge only since 1965. The population of Engels is around 203,000. The city is named after the German social scientist who co-authored Karl Marx to publish in 1845 The Condition of the Working Class in England, based on personal observations and research in Manchester, UK.

Related Content

  • Russian roads and bridges being planned
    April 22, 2020
    Russian road and bridge construction and maintenance works are being planned.
  • Construction of the Gordie Howe Bridge could start in mid-2018
    May 12, 2017
    Construction of the US$2.1 billion Gordie Howe International Bridge is expected to start in late 2018, according to the authority in charge of the project. Preliminary early works on bridge – the second to span the Detroit River ? between Detroit, Michigan in the US and Windsor, in the Canadian province of Ontario have started. A main contractor is likely to be appointed by mid next year. The first phase of early works has focused on fill placement, construction of a perimeter access road and minor utility
  • Construction of the Gordie Howe Bridge could start in mid-2018
    May 12, 2017
    Construction of the US$2.1 billion Gordie Howe International Bridge is expected to start in late 2018, according to the authority in charge of the project. Preliminary early works on bridge – the second to span the Detroit River ? between Detroit, Michigan in the US and Windsor, in the Canadian province of Ontario have started. A main contractor is likely to be appointed by mid next year. The first phase of early works has focused on fill placement, construction of a perimeter access road and minor utility
  • Possible delays for Gordie Howe Bridge
    November 15, 2022
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.