Skip to main content

New viaduct proposed for Ecuador

A new road connection is being put forward for Ecuador, with the project expected to cost in the region of US$1.14 billion. The 44km connection would include a viaduct section over the Guayas River and connect the southern part of Guayaquil with Duran. The contract would require the road and viaduct to be constructed within a four year timeframe and would allow for a 40 year period to maintain the route.
October 9, 2018 Read time: 1 min
A new road connection is being put forward for Ecuador, with the project expected to cost in the region of US$1.14 billion. The 44km connection would include a viaduct section over the Guayas River and connect the southern part of Guayaquil with Duran. The contract would require the road and viaduct to be constructed within a four year timeframe and would allow for a 40 year period to maintain the route.

Related Content

  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.
  • Norway’s long tunnel looks set to beat records
    September 19, 2016
    Norway looks set to retain its position as a leader in tunnelling with the project moving forward to build a new link connecting the city of Stavanger with Bokn. This 27km road tunnel is being designed to carry four lanes of traffic, which would make it the world’s longest underwater road tunnel. It will also be the world’s longest four lane tunnel as well as the world’s deepest road tunnel, dropping around 385-390m below sea level. The Rogaland Fixed Link will form part of the E39 route, connecting Kristia
  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*
  • National Highway Authority of India (NHAI) rolls out new PPP regime
    January 11, 2016
    Financially delinquent contractors working on Indian projects will, from now on, find they are labelled a “non-performer” and barred from further work until they remedy their cash flow. The move by the National Highway Authority of India (NHAI) is an attempt to speed up site work and complete public-private partnership road projects on time. Under the new policies, firms that delay construction or fail to inject their share of capital into their projects will be barred from participating in fresh bids un