Skip to main content

New South Wales is seeking financial packers for WestConnex in Sydney

Investment bank Goldman Sachs will soon be sending out expressions of interest for backers to finance Australia’s biggest road deal, the three-stage WestConnex project to be rollout by the New South Wales government. According to a report by The Australian newspaper, initially around US$1.17 billion will be needed for the first phase of the Sydney toll road project. The first phase will likely cost between nearly $2.35 billion and $3.9 billion. Total cost of all three phases over 10 years could be as
June 19, 2015 Read time: 3 mins
Investment bank 3347 Goldman Sachs will soon be sending out expressions of interest for backers to finance Australia’s biggest road deal, the three-stage WestConnex project to be rollout by the New South Wales government.

According to a report by The Australian newspaper, initially around US$1.17 billion will be needed for the first phase of the Sydney toll road project. The first phase will likely cost between nearly $2.35 billion and $3.9 billion.

Total cost of all three phases over 10 years could be as much as $11.6 billion and the 33kmk of new roads will connect the south-west and western parts of Sydney with the airport, city and port.

Among the Australian lenders expected to be interested in the public-private partnership are Commonwealth Bank, ANZ, Westpac and NAB.

The Australian reported that details will soon emerge surrounding traffic forecasts on the first phase, along with the award of construction contracts.

Exactly what shape the PPP contract will take remains to be seen. It is a sensitive issue, The Australian said, since the collapse of the two PPP toll projects in Sydney. Both Lane Cove Tunnel, a 3.6km twin-tunnel, and Cross City Tunnel, a 2.1km twin-tunnel, went into receivership when traffic forecasts proved inaccurate.

The Australian report said one PPP option is for a shadow toll, where construction company receives a payment per driver from the government.

Earlier this month 3260 World Highways reported that a joint venture featuring 4755 John Holland, 1026 Samsung C&T and 2685 Leighton Contractors had secured a deal to build and design Sydney’s M4 East motorway.

The M4 East is expected to be completed in 2019 when it will form part of a project to build the WestConnex road tunnel.

Last December, Duncan Gay, roads minister of New South Wales, announced changes to the third phase of the WestConnex motorway. Tunnel will be 8km, around 1km longer than initially planned.

However, the changes likely won’t add to the overall price tag for the project, according to the NSW government. The third stage would cover the route between Haberfield and St. Peters and be constructed between 2018 and 2023. The tunnel will be linked to two other large motorway tunnels that include an M4 extension to Harbefield and M5 East tunnel to St. Peters.

Works to build WestConnex will start next year with the $3.3 billion widening and extension of the M4 to four lanes each way from Parramatta to Haberfield, including a tunnel beneath-Parramatta Road.

For more information on companies in this article

Related Content

  • AVTODOR seeks another Moscow-St Petersburg motorway section bid
    December 18, 2014
    Russia's state highways agency AVTODOR has invited bids for construction of another section of the Moscow to St. Petersburg toll motorway. Starting cost of the bid to build the section from kilometre 58-149 is nearly US$1.2 billion. Investors will have to put up front 20% of the accepted bid cost to build the 91km section. Construction of the 700km motorway is being let in sections, with highly competitive bids coming from the major international players in highways infrastructure. In February 2014
  • Major highway growth in Portugal
    February 14, 2012
    Twenty years ago Portugal was bottom of the European league in terms of roads and safety. A series of ambitious plans has seen the country rise to the top. Patrick Smith reports on how this was achieved
  • Kenya moves ahead with double-decker road to address costly city traffic jams
    December 11, 2013
    New double deck roads could cut congestion in Kenyan capital Nairobi – Shem Oirere reports Arapid increase in urban population and diminishing land for infrastructure expansion has forced Kenya to devise ways of addressing the worsening human and vehicular traffic problems in its capital Nairobi. The country national highways agency recently announced progress in the planned construction of the country’s first double-decker highway.
  • Thames Crossing tunnels tendered
    November 13, 2020
    The Crossing will almost double road capacity across the Thames River near London.