Skip to main content

New South Wales is seeking financial packers for WestConnex in Sydney

Investment bank Goldman Sachs will soon be sending out expressions of interest for backers to finance Australia’s biggest road deal, the three-stage WestConnex project to be rollout by the New South Wales government. According to a report by The Australian newspaper, initially around US$1.17 billion will be needed for the first phase of the Sydney toll road project. The first phase will likely cost between nearly $2.35 billion and $3.9 billion. Total cost of all three phases over 10 years could be as
June 19, 2015 Read time: 3 mins
Investment bank 3347 Goldman Sachs will soon be sending out expressions of interest for backers to finance Australia’s biggest road deal, the three-stage WestConnex project to be rollout by the New South Wales government.

According to a report by The Australian newspaper, initially around US$1.17 billion will be needed for the first phase of the Sydney toll road project. The first phase will likely cost between nearly $2.35 billion and $3.9 billion.

Total cost of all three phases over 10 years could be as much as $11.6 billion and the 33kmk of new roads will connect the south-west and western parts of Sydney with the airport, city and port.

Among the Australian lenders expected to be interested in the public-private partnership are Commonwealth Bank, ANZ, Westpac and NAB.

The Australian reported that details will soon emerge surrounding traffic forecasts on the first phase, along with the award of construction contracts.

Exactly what shape the PPP contract will take remains to be seen. It is a sensitive issue, The Australian said, since the collapse of the two PPP toll projects in Sydney. Both Lane Cove Tunnel, a 3.6km twin-tunnel, and Cross City Tunnel, a 2.1km twin-tunnel, went into receivership when traffic forecasts proved inaccurate.

The Australian report said one PPP option is for a shadow toll, where construction company receives a payment per driver from the government.

Earlier this month 3260 World Highways reported that a joint venture featuring 4755 John Holland, 1026 Samsung C&T and 2685 Leighton Contractors had secured a deal to build and design Sydney’s M4 East motorway.

The M4 East is expected to be completed in 2019 when it will form part of a project to build the WestConnex road tunnel.

Last December, Duncan Gay, roads minister of New South Wales, announced changes to the third phase of the WestConnex motorway. Tunnel will be 8km, around 1km longer than initially planned.

However, the changes likely won’t add to the overall price tag for the project, according to the NSW government. The third stage would cover the route between Haberfield and St. Peters and be constructed between 2018 and 2023. The tunnel will be linked to two other large motorway tunnels that include an M4 extension to Harbefield and M5 East tunnel to St. Peters.

Works to build WestConnex will start next year with the $3.3 billion widening and extension of the M4 to four lanes each way from Parramatta to Haberfield, including a tunnel beneath-Parramatta Road.

For more information on companies in this article

Related Content

  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • Australian road project tender process
    April 30, 2020
    A major Australian road project is entering the tender process.
  • Major Australian tunnel contract has been awarded
    October 29, 2021
    A major Australian tunnel contract has been awarded to a consortium.