Skip to main content

New Slovakia-Hungary bridge crossing

A new bridge connecting Slovakia with Hungary is under construction at present. Costing €117 million, the bridge spans the River Danube connecting Komarno in Slovakia with Komarom in Hungary. The project has been delayed but the bridge should be ready for traffic in 2020. Funding for the project is being provided by the EU and is being directed through the Slovakian Government and the Hungarian Government.
June 7, 2019 Read time: 1 min

A new bridge connecting Slovakia with Hungary is under construction at present. Costing €117 million, the bridge spans the River Danube connecting Komarno in Slovakia with Komarom in Hungary. The project has been delayed but the bridge should be ready for traffic in 2020. Funding for the project is being provided by the EU and is being directed through the Slovakian Government and the Hungarian Government.

Related Content

  • Slovakia’s major road safety gain
    June 13, 2014
    Slovakia is having major success in cutting road deaths. A report from the European Transport Safety Council (ETSC) reveals that Slovakia has made the most progress in saving lives since an EU target to halve road deaths by 2020 was set four years ago. Official data shows that 26,025 people died as a result of road crashes in the EU in 2013, while 199,000 were seriously injured. There is concern that the numbers seriously injured in road crashes are not falling at same rate as deaths and there has now been
  • Vietnam’s major road and bridge projects
    September 27, 2021
    Work continues for Vietnam’s major road and bridge projects.
  • New Russian bridge to span Volga
    July 6, 2020
    A new Russian bridge is planned to span the River Volga.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.