Skip to main content

New road tender packages for Brazil being offered

Brazil is launching the tendering process for a series of road projects that extend a total of 16,000km. These projects are being planned to open for tender by 2021. From 7,000-8,000km of road projects will open for tender in 2020 and another 8,000km will open to tender in 2021. In addition a number of other road projects will open to tender in 2022. A series of feasibility studies are being carried out at present for a number of major road projects. Approval for the BR-101 highway project in Santa Catarina
September 18, 2019 Read time: 1 min
Brazil is launching the tendering process for a series of road projects that extend a total of 16,000km. These projects are being planned to open for tender by 2021. From 7,000-8,000km of road projects will open for tender in 2020 and another 8,000km will open to tender in 2021. In addition a number of other road projects will open to tender in 2022. A series of feasibility studies are being carried out at present for a number of major road projects. Approval for the BR-101 highway project in Santa Catarina is due shortly.

Related Content

  • India plans major infrastucture investment
    April 5, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt. After years of planning some projects were incomplete, there were health scares and a br
  • Mumbai’s coastal road project is underway
    April 7, 2021
    Construction work is underway for Mumbai’s complex coastal road project.
  • XCMG sets out six stage path for future plans
    October 14, 2013
    XCMG has seen strong exports, with one deal in particular providing a major boost to turnover - Mike Woof writes It is rare that a single machine order can provide a substantial portion of a large manufacturer’s annual results. However the firm’s massive contract signed with the Venezuelan Government was a major boost to XCMG; the supply of no less than 6025 machines in a deal worth some US$750 million. This order came at an important time for the company when the world demand for construction equipment sl
  • New advances in electric motors
    December 17, 2012
    New advances in electric motor development could lead to more efficient electric vehicles being developed. Japan’s Tohoku University has been working on switched reluctance motors that feature an axial gap design and do not require permanent magnets. These can deliver the same torque as motors featuring permanent magnets however, a key point as the cost of the rare earths needed in permanent magnets has increased. Meanwhile Nissan said that sales of its Leaf model are now growing, with 46,000 having been bo