Skip to main content

New Nigerian road and bridge transport connection

A new road and bridge transport connection is proposed for South East Nigeria.
By MJ Woof March 3, 2020 Read time: 2 mins
A proposed new road link in South East Nigeria will help improve transport to and from the historic city of Calabar – image courtesy of © Farmer, Dreamstime.com

A new road project is proposed that will improve transport in South East Nigeria. The 23km road will boost the transport links between Akwa Ibom State and Cross River State, the latter of which borders with Nigeria’s neighbouring nation, Cameroon. The new link is expected to cost US$1.07 billion, speeding transport between Akwa Ibom State and Cross River State.

At present, the main road link between the two is the somewhat circuitous route passing through Ayadeghe and Inwa Akpa, connecting with the A4 Murtala Mohammed Highway that runs towards Calabar in the south of Cross River State. Transport between Calabar and the nearby town of Oron in Akwa Ibom state relies heavily on water traffic at present.

Funding to help pay for the project is being sought from China’s Exim Bank in the shape of a loan worth $800 million. The project will face a number of technical challenges due to the terrain.

Construction of the new road is expected to take two to three years to complete. The work will make a major contribution to the economic development of South East Nigeria. Although much of the country’s economic wealth derives from the oil industry in South East Nigeria, the transport infrastructure in the region has suffered from a lack of investment reaching back over many decades.

Related Content

  • Chinese contractor wins major Nigerian road project
    November 11, 2013
    A road construction contract worth US$1.07 billion has been awarded to China Railway Construction in Nigeria. The Ministry of Delta Affairs of Nigeria awarded the package of works for Section V of the A121 East-West highway to China Civil Engineering Construction, a division of China Railway Construction. The work is expected to take five years to complete and includes design as well as construction. When it is complete, the A121 will connect Nigeria’s two main North-South highways. Its route runs from the
  • New dual carriageway for South East Nigeria
    March 11, 2015
    Work is nearing completion on Nigeria’s important East-West road project. The new dual carriageway link should be ready to carry traffic in a matter of months. In all the project was originally expected to cost in the order of US$1.93 billion to construct and work commenced back in 2006. However an additional stretch may now be added that will extend the route. This project is of significance as it improves transport links to the South East of Nigeria, an area of the country that has long been overlooked fo
  • Nigeria’s coastal highway project
    March 10, 2025
    Work is starting for Nigeria’s coastal highway project.
  • Chinese firm for Nigerian contract
    January 24, 2014
    A road construction contract worth US$1.07 billion has been awarded to China Railway Construction in Nigeria. The Ministry of Delta Affairs of Nigeria awarded the package of works for Section V of the A121 East-West highway to China Civil Engineering Construction, a division of China Railway Construction.