Skip to main content

New Macedonia highway section opening

A new highway stretch measuring 28km long is opening in Macedonia. The work has been carried out by the Greek contractor Aktor. The project has cost €227 million. The new highway section runs from Demir Kapija to Smokvica. Financing has been provided jointly by the European Bank for Reconstruction and Development (EBRD), the European Investment Bank (EIB), a number of funds and also by Macedonia’s own budget. The completion of this section of highway now completes the route connecting the north and south of
April 30, 2018 Read time: 1 min

A new highway stretch measuring 28km long is opening in Macedonia. The work has been carried out by the Greek contractor 1570 Aktor. The project has cost €227 million. The new highway section runs from Demir Kapija to Smokvica. Financing has been provided jointly by the European Bank for Reconstruction and Development (EBRD), the European Investment Bank (EIB), a number of funds and also by Macedonia’s own budget. The completion of this section of highway now completes the route connecting the north and south of Macedonia.

For more information on companies in this article

Related Content

  • Support for Poland’s A1
    July 6, 2012
    The European Investment Bank (EIB) has in total granted a long-term facility of €1.070 billion for the construction of the second phase of the A1 motorway forming part of the priority trans-European transport network connecting the north of Poland (Gdansk) with the Austrian capital Vienna, via the Czech and Slovak Republics. The loan will finance the construction of a 62km section of the A1 motorway between Nowe Marzy and Torun on the basis of a design, build, finance and operate (DBFO) concession. This con
  • Bechtel-Enka win North Macedonia deal
    March 21, 2023
    The US-Turkish joint venture will build four sections of the European Corridors VIII and X in the Balkan country north of Greece.
  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
  • Virginia I-95 highway section opening
    August 22, 2023
    A Virginia I-95 highway stretch is opening.