Skip to main content

New date set for bauma CTT Moscow

A new date has been set for the bauma CTT Moscow exhibition.
By MJ Woof March 30, 2020 Read time: 1 min
The Moscow bauma CTT event will now be held in September

A new date has been set for the planned bauma CTT Moscow construction machinery exhibition, planned to be held in Russia’s capital.

Following the directives of the Government of the city and region of Moscow to prevent and control the coronavirus from spreading, Messe München was compelled to postpone bauma CTT RUSSIA, which was planned to take place in May.

The new date has been set and the trade fair will be held from September 8th to 11th, 2020 at the Crocus Expo facility in Moscow.

 

Related Content

  • LiuGong holds 11th global dealer conference in Liuzhou
    November 18, 2014
    LiuGong Machinery, a Chinese manufacturer of heavy equipment, had more than 500 dealer representatives from 80 countries attend the company’s 11th annual global dealership conference. The event was held this month at the Liuzhou International Exhibition Centre in Liuzhou, in north-central China, home of LiuGong. The company, which had global sales US$2 billion in 2013, also held demonstrations of its equipment. LiuGong was set up in 1958 and sold more than 43,000 units last year. In 2011, Cummins and LiuG
  • Outstanding success of international SMOPYC show
    April 10, 2012
    Organisers of the International Show of Public Works, Construction and Mining Machinery have made every effort to assist the sector on the road to recovery Organisers are sure that the upturn in business seen in some sectors will make SMOPYC 2011 an "outstanding event." The 15th event, being held at Zaragoza Trade Fair Centre, Spain, from 5-9 April, will boast nine halls (100,000m2 of covered space) and 200,000m2 of outdoor space to display heavy machinery, along with demonstrations and sponsored areas.
  • New Moscow highway project planned
    September 10, 2019
    A new highway project is being planned to improve transport links to and from Russia’s capital, Moscow. The 16km route will connect Vinogradovo, Boltino and Tarasovka featuring two lanes in either direction. The link will feature six bridges and overpasses and is expected to carry from 24,600-33,800 vehicles/day. The route will be managed by the Fourth Concession Company following an agreement with the Gazprom Bank. Construction should be complete by 2022, with the project worth over US$375 million and the
  • €150.22bn to implement Moscow’s 2020 transport strategy
    July 30, 2013
    Russia: On transport development strategy for Moscow region until 2020. The new Moscow region transport strategy until 2020 aims to develop and popularise public transport, strengthen connections between districts via transverse highways, optimise cargo traffic, and increase safety. The strategy, devised by the Research and Design Institute of Moscow City Master Plan (NIiPI Genplan) after a request by the Moscow Transport Hub's Directorate, if successfully implemented is predicted to see an increase in annu