Skip to main content

New bridge crossing for Louisiana

A new bridge carrying Interstate 10 is being planned for Calcasieu in Louisiana. The new structure is expected to cost from US$400-600 million to construct and will feature three lanes in either direction, with provision also for cyclists and pedestrians. The bridge will be built to the north of the existing I-10 bridge, which was constructed in 1952 and is no longer able to cope adequately with the traffic volumes it carries. The new bridge is expected to be funded privately, with tolls for drivers crossin
February 8, 2019 Read time: 1 min

A new bridge carrying Interstate 10 is being planned for Calcasieu in Louisiana. The new structure is expected to cost from US$400-600 million to construct and will feature three lanes in either direction, with provision also for cyclists and pedestrians. The bridge will be built to the north of the existing I-10 bridge, which was constructed in 1952 and is no longer able to cope adequately with the traffic volumes it carries. The new bridge is expected to be funded privately, with tolls for drivers crossing the structure. However approval for the project has yet to be given by the local authorities.

Related Content

  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.
  • $1.56 billion Vietnam expressway expansion delayed
    July 7, 2025
    A $1.56 billion expressway expansion project in Vietnam is delayed.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Explosive demolition of US421 bridge over Ohio River
    September 23, 2013
    The fourth and final section of the Milton-Madison Bridge in the US has now been demolished. This aged 740m long structure was no longer able to cope with the traffic volumes along the route and has been demolished to make way for a new bridge. The bridge connects the US states of Indiana and Kentucky and has provided a key traffic route for the busy US421 over the Ohio River for many years. In a rather innovative piece of engineering, the new bridge has been constructed alongside the old structure and even