Skip to main content

New bridge crossing for Louisiana

A new bridge carrying Interstate 10 is being planned for Calcasieu in Louisiana. The new structure is expected to cost from US$400-600 million to construct and will feature three lanes in either direction, with provision also for cyclists and pedestrians. The bridge will be built to the north of the existing I-10 bridge, which was constructed in 1952 and is no longer able to cope adequately with the traffic volumes it carries. The new bridge is expected to be funded privately, with tolls for drivers crossin
February 8, 2019 Read time: 1 min

A new bridge carrying Interstate 10 is being planned for Calcasieu in Louisiana. The new structure is expected to cost from US$400-600 million to construct and will feature three lanes in either direction, with provision also for cyclists and pedestrians. The bridge will be built to the north of the existing I-10 bridge, which was constructed in 1952 and is no longer able to cope adequately with the traffic volumes it carries. The new bridge is expected to be funded privately, with tolls for drivers crossing the structure. However approval for the project has yet to be given by the local authorities.

Related Content

  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • North-South Nigeria road link
    May 20, 2024
    A North-South Nigeria road link is planned.
  • New Maryland bridge planned
    May 2, 2022
    A new bridge is planned for the US state of Maryland.