Skip to main content

Netherlands to finish widening of the A1 from Amsterdam to Germany

Dutch construction company Heijmans has been awarded the final contract for the A1 motorway project between Apeldoorn and Azelo in the Netherlands. The €127 million contract will see the widening of 28km of motorway between Twello and Deventer to eight lanes and the road between Deventer-Oost and Rijssen widened to six lanes. Works is expected to start in spring 2019 for completion in the autumn 2020.
July 2, 2018 Read time: 1 min
Dutch construction company 1271 Heijmans has been awarded the final contract for the A1 motorway project between Apeldoorn and Azelo in the Netherlands.


The €127 million contract will see the widening of 28km of motorway between Twello and Deventer to eight lanes and the road between Deventer-Oost and Rijssen widened to six lanes.

Works is expected to start in spring 2019 for completion in the autumn 2020.

The A1 runs from the capital Amsterdam, near the interchange of Watergraafsmeer, with the German border near Oldenzaal and Bad Bentheim where it becomes the German Autobahn BAB 30.

For more information on companies in this article

Related Content

  • STRABAG wins contract for Hamburg, Germany
    August 26, 2020
    STRABAG has won a major highway contract in Hamburg, Germany.
  • France mulls widening the A31 between Nancy and Thionville
    December 20, 2018
    France is considering a 115km project to enlarge the A31 motorway between Nancy and Thionville near the border with Luxembourg. This project is expected to cost between €1.4-1.6 billion and work will be divided into three sections. The A31 autoroute, also known as l'Autoroute de Lorraine-Bourgogne, runs from the border with Luxembourg to Beaune where it joins the A6. It serves the cities of Metz, Nancy and Dijon and is heavily used in the holiday season as it is a convenient route for those travelling
  • BAM half year results show jump in pre-tax profit
    August 19, 2016
    Dutch construction and related services group Royal BAM posted improved half-year results, despite Britain’s decision to leave the European Union. Half-year results to June showed pre-tax profit to €45 million, up from €4 million the previous year. However, group revenue slipped back €3.4 billion, down from around €3.5 billion. Construction and mechanical & electrical services suffered a €23.8 million loss, blamed on poor trading in Germany. But civil engineering and property helped profitability.
  • Germany plans replacement for A40 Neuenkamp Duisburg Bridge
    March 6, 2018
    Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.