Skip to main content

Myanmar expressway loan proposed

A loan is proposed to help finance a key Myanmar expressway link.
By MJ Woof July 30, 2020 Read time: 1 min
A loan could finance a new expressway link in Myanmar – image © courtesy Peter Hermes Furian, Dreamstime.com

A loan is being proposed as the financing solution for Myanmar’s Bago-Kyaikhto Expressway. The Myanmar Government is considering asking the Asian Development Bank (ADB) to supply a loan of close to US$4484 million for the project.

The Bago-Kyaikhto Expressway will form part of the Greater Mekong economic corridor, which is why it has importance as a transport route for East Asia as a whole and not just for Myanmar. This importance is why the Myanmar Government believes that the ADB should provide such a significant portion of the financing required.

The 62km Bago-Kyaikhto Expressway will feature two lanes in either direction. The route will connect eastern Yangon, including Kayan, Bago, Thanlyin, Thanetpin, Thilawa, Thonegawa. The Greater Mekong corridor meanwhile will connect Myanmar with Vietnam, running though Thailand and Laos. The route is of particular importance to landlocked Laos as it will give improved access to ports in Myanmar and Vietnam.

For more information on companies in this article

Related Content

  • Bangladesh highway development project for trade corridor
    October 27, 2017
    Funding worth US$1.2 billion will help pay for the stage two portion of the project to upgrade the Northwest Trade Corridor project in Bangladesh. The highway will improve transport connections to and from Dhaka, with stage two being for the 190km stretch between Elenga and Rangpur. This funding is being provided by the Philippines-based Asian Development Bank (ADB), although further financing from the Bangladesh Government will pay for the remaining $472.6 million required for this highway section.
  • Two new Vietnam expressways
    February 15, 2017
    Work on two new expressways will commence in Vietnam during 2017. The projects are both being managed by the Vietnamese Government and are being constructed in the southern province of Dong Nai. A build-operate-transfer (BOT) format will be employed for the construction of a 60-kilometer-long first section A 60km expressway will run through Tan Phu and Dau Giay and join with the Dau Giay-Lien Khuong expressway, with the work being carried out under the build, operate, transfer model. This expressway
  • Ethiopia’s new tolled highway opens
    June 21, 2019
    Ethiopia is now benefiting from a new tolled route, improving transport between Dire Dawa and Dewele.
  • Vietnam expressway construction project halted
    November 6, 2020
    Construction work on an important Vietnamese expressway project has been halted.