Skip to main content

Myanmar bridge construction project underway

Construction work is underway on the new bridge spanning the Bago River in Myanmar. Much of the funding for the 1,928m bridge is being provided by the Japan International Cooperation Agency (JICA) in the form of a loan worth US$272.6 million. It is expected to cost $289 million in all to build, with completion expected in 2023. The bridge connects Thanlyin with Yangon’s Thaketa Township area and is being built just 125m from the existing bridge over the Bago River. This new cable-stayed structure will help
February 18, 2019 Read time: 1 min
Construction work is underway on the new bridge spanning the Bago River in Myanmar. Much of the funding for the 1,928m bridge is being provided by the 2416 Japan International Cooperation Agency (JICA) in the form of a loan worth US$272.6 million. It is expected to cost $289 million in all to build, with completion expected in 2023. The bridge connects Thanlyin with Yangon’s Thaketa Township area and is being built just 125m from the existing bridge over the Bago River. This new cable-stayed structure will help improve traffic flow as it features two lanes in either direction, reducing delays for drivers as the existing bridge can be congested at peak periods. Of importance is that it is being designed to carry the heavy trucks moving to and from the industrial areas around Yangon.

For more information on companies in this article

Related Content

  • Brazil-Paraguay bridge project underway
    August 12, 2019
    A new bridge connecting Presidente Franco in Paraguay with Foz do Iguaçu in Brazil is now being built. The bridge will be the second spanning the Parana River in the area and is costing US$84.35 million to construct. The present Puente Internacional de la Amistad connection joins Paraguay’s Route 7 with Brazil’s Route 277 but is no longer able to cope with demand. The new bridge will carry all the heavy truck traffic passing this important international border when it opens, with the existing structure bein
  • New expressway underway for key Vietnamese link
    October 31, 2012
    Preparation work is underway in Vietnamese city Da Nang for the planned Da Nang-Quang Ngai Expressway. The 140km road will link the provinces of Quang Ngai and Quang Nam and site clearance work worth around US$48 million in compensation is being carried out at present. Construction of the expressway itself will commence in mid-2013 and the new road will cut journey times from three hours along the existing route to just two hours.
  • Loan provided for Virginia road project
    November 29, 2023
    A US$141 million loan has been provided for a Virginia road project.
  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans