Skip to main content

Myanmar bridge construction project underway

Construction work is underway on the new bridge spanning the Bago River in Myanmar. Much of the funding for the 1,928m bridge is being provided by the Japan International Cooperation Agency (JICA) in the form of a loan worth US$272.6 million. It is expected to cost $289 million in all to build, with completion expected in 2023. The bridge connects Thanlyin with Yangon’s Thaketa Township area and is being built just 125m from the existing bridge over the Bago River. This new cable-stayed structure will help
February 18, 2019 Read time: 1 min
Construction work is underway on the new bridge spanning the Bago River in Myanmar. Much of the funding for the 1,928m bridge is being provided by the 2416 Japan International Cooperation Agency (JICA) in the form of a loan worth US$272.6 million. It is expected to cost $289 million in all to build, with completion expected in 2023. The bridge connects Thanlyin with Yangon’s Thaketa Township area and is being built just 125m from the existing bridge over the Bago River. This new cable-stayed structure will help improve traffic flow as it features two lanes in either direction, reducing delays for drivers as the existing bridge can be congested at peak periods. Of importance is that it is being designed to carry the heavy trucks moving to and from the industrial areas around Yangon.

For more information on companies in this article

Related Content

  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    September 19, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering* Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s p
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • New highway links spanning the Mississippi River
    August 9, 2017
    Construction work is now underway for new bridges carrying the I-74 Interstate highway across the Mississippi River between Iowa and Illinois in the Quad Cities area. The project forms part of a US$1 billion programme of works intended to cut congestion at peak periods along the route. This will improve traffic flow and reduce journey times for drivers. The project is being planned jointly by the Department of Transportation for Illinois and the Department of Transportation for Iowa. The highway bridges wil
  • Florida turnpike contract for Lane
    July 29, 2022
    Lane Construction has been awarded a Florida turnpike contract.