Skip to main content

Mumbai names BrihanMumbai Municipal as winner for coastal freeway

The state government of Maharashtra in India has named BrihanMumbai Municipal Corporation (BMC) as preferred bidder for construction of Mumbai’s Coastal Freeway worth around US$1.36 billion. The 35.6km freeway, subject to clearance from the central government in New Delhi, will run from Mumbai’s business district, called Nariman Point, to the northern suburb of Kandivli. Coastal Freeway, which runs beside the sea, on reclaimed lands, landfill sites and some small bridges, is the alternative to the mor
April 15, 2015 Read time: 2 mins
The state government of Maharashtra in India has named BrihanMumbai Municipal Corporation (BMC) as preferred bidder for construction of Mumbai’s Coastal Freeway worth around US$1.36 billion.

The 35.6km freeway, subject to clearance from the central government in New Delhi, will run from Mumbai’s business district, called Nariman Point, to the northern suburb of Kandivli.

Coastal Freeway, which runs beside the sea, on reclaimed lands, landfill sites and some small bridges, is the alternative to the more expensive highway built out into the sea, called sea links.

For a video of the Coastal Freeway plan, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal click here video of the Coastal Freeway plan false https://www.youtube.com/watch?v=w9nDAQSkHG0 false false%>.

At the same time, the Maharashtra government cancelled three sea link projects that are part of the Western Freeway Sea Link. The cancelled projects are the $962 million Bandra-Versova sea link, the $801 million Nariman Point-Haji Ali sea link and the Worli-Haji Ali sea link, also costing $801 million.

The move was taken after the state government received overwhelming opposition from various parties over a proposal to introduce a toll collection for the three sea links, according to a report in the Business Standard newspaper.

Related Content

  • New conference plans for European road directors
    October 30, 2013
    Plans are in hand for the Conference of European Directors of Roads (CEDR). This event is now run every four years, with this next CEDR conference being the third to be held. The governing board for CEDR held a meeting in Helsinki and the Road Directors’ association reviewed the final report on the implementation of its previous strategic plan and the formalisation of its next. The CEDR strategic plan 3 (SP3) is to develop the priorities and targets for its next cycle. Each SP determines the structuring an
  • Getech’s versatile sludge treatment solution
    April 5, 2013
    Due to an innovative and strong frame design and the use of premium raw materials and components, Getech/Gennaretti centrifuges can be employed across mining, tunnelling, petroleum and chemical industry-based sludge treatment processes. They can also be built in mobile plants on containers, easy to transport to remote areas and quick to install, able to manage sludge volumes going from 5 to 150m³ per hour.
  • Rapid International showcases its RP375 planetary mixer
    January 6, 2017
    Rapid International has been showing bauma visitors its Rapid RP375 planetary mixer, which is said to be popular with both the precast and ready-mix industries. The company also took the opportunity to unveil its new-look corporate branding.
  • Rapid International showcases its RP375 planetary mixer
    April 18, 2013
    Rapid International has been showing bauma visitors its Rapid RP375 planetary mixer, which is said to be popular with both the precast and ready-mix industries. The company also took the opportunity to unveil its new-look corporate branding.