Skip to main content

Mumbai names BrihanMumbai Municipal as winner for coastal freeway

The state government of Maharashtra in India has named BrihanMumbai Municipal Corporation (BMC) as preferred bidder for construction of Mumbai’s Coastal Freeway worth around US$1.36 billion. The 35.6km freeway, subject to clearance from the central government in New Delhi, will run from Mumbai’s business district, called Nariman Point, to the northern suburb of Kandivli. Coastal Freeway, which runs beside the sea, on reclaimed lands, landfill sites and some small bridges, is the alternative to the mor
April 15, 2015 Read time: 2 mins
The state government of Maharashtra in India has named BrihanMumbai Municipal Corporation (BMC) as preferred bidder for construction of Mumbai’s Coastal Freeway worth around US$1.36 billion.

The 35.6km freeway, subject to clearance from the central government in New Delhi, will run from Mumbai’s business district, called Nariman Point, to the northern suburb of Kandivli.

Coastal Freeway, which runs beside the sea, on reclaimed lands, landfill sites and some small bridges, is the alternative to the more expensive highway built out into the sea, called sea links.

For a video of the Coastal Freeway plan, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal click here video of the Coastal Freeway plan false https://www.youtube.com/watch?v=w9nDAQSkHG0 false false%>.

At the same time, the Maharashtra government cancelled three sea link projects that are part of the Western Freeway Sea Link. The cancelled projects are the $962 million Bandra-Versova sea link, the $801 million Nariman Point-Haji Ali sea link and the Worli-Haji Ali sea link, also costing $801 million.

The move was taken after the state government received overwhelming opposition from various parties over a proposal to introduce a toll collection for the three sea links, according to a report in the Business Standard newspaper.

Related Content

  • Hidromek has developed a long reach excavator
    January 6, 2017
    A new version of Hidromek’s well accepted HMK220LC excavator is being offered with a long reach boom for use in special earthmoving and drainage applications. Called the HMK200LC LR, this machine is designed for fine grading at long reach, as well as for duties such as ditching and drainage clearance. As with the standard machines, Tier 4 Interim/Stage IIIB emission certified engine and hydraulics components are used. According to export manager Anil Bingöl, this machine widens Hidromek’s standard excavator
  • Hidromek has developed a long reach excavator
    February 6, 2013
    A new version of Hidromek’s well accepted HMK220LC excavator is being offered with a long reach boom for use in special earthmoving and drainage applications. Called the HMK200LC LR, this machine is designed for fine grading at long reach, as well as for duties such as ditching and drainage clearance. As with the standard machines, Tier 4 Interim/Stage IIIB emission certified engine and hydraulics components are used. According to export manager Anil Bingöl, this machine widens Hidromek’s standard excavator
  • Trimble boosts operator productivity
    January 6, 2017
    The US firm is raising the bar at INTERMAT 2015, showing off the new version of its control system: it could save operators up to 40% and demonstrates how Trimble keeps pushing the boundaries of what is possible.
  • Trimble boosts operator productivity
    April 21, 2015
    The US firm is raising the bar at INTERMAT 2015, showing off the new version of its control system: it could save operators up to 40% and demonstrates how Trimble keeps pushing the boundaries of what is possible.