Skip to main content

Mostostal Warszawa makes lowest bids in Poland’s S9 tenders

A Mostostal Warszawa consortium has reportedly made the lowest bids to build three sections of the S19 from Nisko to Sokolow Malopolski in south-eastern Poland. The consortium’s bid was just over €187 million in total. Other bids which were received from a Strabag consortium and a Budimex consortium.
November 24, 2017 Read time: 2 mins
A 3304 Mostostal Warszawa consortium has reportedly made the lowest bids to build three sections of the S19 from Nisko to Sokolow Malopolski in south-eastern Poland.


The consortium’s bid was just over €187 million in total. Other bids which were received from a 945 Strabag consortium and a 3302 Budimex consortium.

Poland’s roads authority 1361 GDDKiA is expected to sign a deal in the second quarter of 2018 with work to start after mid-2019 and completion in 2021.
 
Meanwhile, contractor 3544 Warbud has signed deal with the GDDLiA to build a 2.5km section of Warsaw ring-road for nearly €94 million. The section will be of three 3.5m-wide lanes and a hard shoulder in each direction. Delivery is expected by mid-April 2021.

In north-western Poland, an agreement has been signed for more than €117 million of European Union support for construction of a section of the S6 dual carriageway. Work includes building around 54km of road as well as a number of service stations and six junctions.

The north-western contract is divided into three sections: Goleniow-Nowogard, Nowogard-Ploty and Ploty-Kielpino. The first of the sections is scheduled for completion in April 2019 and the third in May 2019.

For more information on companies in this article

Related Content

  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • Trakcja and Mostostal Warszawa pick up S61 deal in Poland
    July 25, 2018
    A consortium of PRKiI Trakcja and Mostostal Warszawa has signed a contract for construction of an S61 dual carriageway section between the Elk Poludnie to and Wysokie junctions. The work, costing around €159 million, is scheduled for completion in June 2021. The S61 expressway will, when finished, run south from the Polish-Lithuanian border near Budzisko where it will connect with Lithuania’s A5 and intersect with the S8 near Ostrów Mazowiecka. It will also be part of the Via Baltica connecting the Ba
  • Poland: Rubau Polska makes lowest bid in S61Via Baltica tender
    August 11, 2017
    Poland’s road authority GDDKiA said that five groups have tendered for construction of a 17.5km section of the S61 Expressway. The section runs from Podborze junction to Sniadowo junction and all bids fall within the investor's budget of around €146 million. The lowest offer reportedly was from a Rubau Polska consortium, at around €112 million, while the highest bid was lodged by Budimex at around €139 million.
  • Polish road tender underway
    February 3, 2015
    Plans are underway for the Warsaw Ring Road project in Poland. Italian contractor Astaldi made the lowest offer for the project at €289.95 million. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete. There have been 10 bidders for the tender, being handled by the Polish road authority GDDKiA. Other bidders included the Porr Polska consortium and a construction consortium comprising contractors Budimex and Strabag.