Skip to main content

More roadblocks for Ontario Highway 413

A report by environmental groups claims the 400-series motorway is not needed.
By David Arminas September 9, 2020 Read time: 2 mins
Easier travel across York, Peel and Halton Regions, according to a government map highlighting the GTA West Route Planning Study Area (image courtesy Ontario Ministry of Transportation)

Canadian environmental groups have released a report that they claim reveals the proposed GTA West Highway is a "poor use" of $6 billion (US$4.6 billion).

The GTA West Corridor – also known as Highway 413 - is a proposed motorway near Toronto in the Canadian province of Ontario. It would be an outer orbital beltway around the built-up areas of the towns of Brampton and Vaughan that would permit traffic traveling between Southwestern Ontario and Ontario's cottage country or Northern Ontario to avoid Toronto-focused traffic.

The Ministry of Transportation of Ontario has faced stiff criticism by environmental and other public groups over the years because the route would cut through farmland and greenbelt areas. The argument is that it would encourage more urban sprawl in an area that has seen major expansion of the city limits of Toronto and other towns in the past several decades.

Specifically, the proposed highway would run from Highway 407 near the town of Milton to Highway 400 near the town of Kleinburg. It would be a four-to-six lane 400-series highway with separate infrastructure dedicated to transit and passenger stations, truck parking and incorporate intelligent transportation features. The provincial government said that by 2031, overall traffic on the route would likely exceed 300,000 daily vehicle trips.

The town of Vaughan and the York Region area are reportedly in favour of 413. But in 2017, an investigative panel appointed by the Ontario government declared the highway unnecessary.

In 2018 the Ontario government revived the shelved plan amid continued criticism by concerned groups, including Environmental Defence, Sustainable Vaughan and Transport Action Ontario.

The local YorkRegion.com news website recently reported that Keith Brooks, programmes director with Environmental Defence, also dismissed the highway project as unnecessary. "Highway 413 was cancelled because the public didn’t want it and because experts determined that the social, environmental and economic costs of the highway outweighed the meager benefits that this project could deliver."

Brooks said more people expected to work from home in future so the highway would be redundant.

YorkRegion.com reported that there is concern that about 1,000 hectares of Greenbelt would be affected along with damage from road salt, air pollution and increased greenhouse gas emissions.

Environmental and transportation groups want to see more planning and investment for public transit investment, including the regional  GO Regional Express Rail on the Kitchener and Milton corridors, a new GO rail corridor to Bolton and increased bus rapid transit or light rail transit for the towns of Vaughan, Brampton and Mississauga.

 

Related Content

  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop
  • Canada: doubts persist about proposed Howse Pass highway through Rocky Mountains
    March 11, 2020
    Alberta group attempts to revive the idea of a Howse Pass highway.
  • Nairobi road to nowhere?
    January 3, 2013
    International environmental pressure groups claim a vital road in Kenya goes through parkland as Shem Oirere reports. Kenya’s Nairobi Southern Bypass, a 28.6km stretch has become the second road project in East Africa to run into problems. Designed to the Class A International Trunk Road Standard, the route has been targeted by international environmental pressure groups following Tanzania’s Serengeti Highway, which was derailed last year. The US$208 million bypass will link Mombasa Road, near Ole Sereni Ho
  • Ontario embarks upon major road repair programme
    June 14, 2019
    The Canadian province of Ontario has earmarked around US$1 billion for road repairs and upgrades during 2019. The money is for 123 projects of which around $384 million will go to 20 projects in central Ontario. Northeastern Ontario will receive $218 million for 32 highway projects, mostly along Highway 11 – at nearly 1,800km the second longest in Ontario, Canada’s mostly populous province. Highway 11 runs from the provincial capital Toronto northwards and then westwards to the border with Manitoba pr