Skip to main content

More cash for BC Trans-Canada upgrades

Procurement for phase 3B of the Highway 1 improvements, between Langley and Abbotsford, in the Canadian province of British Columbia will start next year.
By David Arminas August 30, 2024 Read time: 2 mins
The project includes construction of four interchanges and rebuilding of numerous highway overpasses to enhance the clearance height for commercial vehicles (image courtesy British Columbia government)

The provincial British Columbia government in Canada has pledged an extra US$1.96 billion for Highway 1 improvements through the Fraser River Valley near Vancouver.

Procurement for phase B of the overall project - between the communities of Langley and Abbotsford - is set to start in 2025, with significant construction starting in 2026 and completion targeted for 2031, according to the provincial ministry of transportation. The project includes construction of four interchanges and rebuilding of numerous highway overpasses to enhance the clearance height for commercial vehicles.

David Eby, premier of the province, announced the added funding for the work that will be entirely within Abbotsford along an 8km stretch of the Highway 1 – also called the Trans-Canada Highway.

Phase 3B components entail the addition of an HOV/battery-electric vehicle lane in each direction, a new Highway 11 interchange and replacement of the Peardonville Road crossing.

Meanwhile, phase 3A along 13km of the Trans-Canada will cost around $1.71 billion. The entire 21km Highway 1 phase 3 improvement segment will now cost $3.65 billion.

The Trans-Canada Highway is a federal–provincial highway system that runs nearly 7,500km from the Pacific to Atlantic coasts, through all 10 provinces - one of the longest routes of its type in the world. However, unlike Interstate highways in the US, the Trans-Canada has no national construction standard. Most of it was built as a two-lane highway with few multi-lane freeway sections and standards vary considerably among provinces and cities.
 

Related Content

  • Spencer Group cable access for Pattullo Bridge
    July 3, 2023
    Spencer is working on behalf of Fraser Crossing Constructors GP - a joint venture between Acciona and Aecon - on the suspension bridge near Vancouver, Canada.
  • Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided
    October 23, 2015
    Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

    The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.
  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    October 2, 2018
    Bridging North America will build the Gordie Howe Bridge, named after a famous Canadian ice hockey player and leading scorer A partnership including Fluor Canada and ACS Infrastructure Canada has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michig
  • RFQ is out for the Gordie Howe Bridge to link US and Canada
    July 22, 2015
    The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b