Skip to main content

More cash for BC Trans-Canada upgrades

Procurement for phase 3B of the Highway 1 improvements, between Langley and Abbotsford, in the Canadian province of British Columbia will start next year.
By David Arminas August 30, 2024 Read time: 2 mins
The project includes construction of four interchanges and rebuilding of numerous highway overpasses to enhance the clearance height for commercial vehicles (image courtesy British Columbia government)

The provincial British Columbia government in Canada has pledged an extra US$1.96 billion for Highway 1 improvements through the Fraser River Valley near Vancouver.

Procurement for phase B of the overall project - between the communities of Langley and Abbotsford - is set to start in 2025, with significant construction starting in 2026 and completion targeted for 2031, according to the provincial ministry of transportation. The project includes construction of four interchanges and rebuilding of numerous highway overpasses to enhance the clearance height for commercial vehicles.

David Eby, premier of the province, announced the added funding for the work that will be entirely within Abbotsford along an 8km stretch of the Highway 1 – also called the Trans-Canada Highway.

Phase 3B components entail the addition of an HOV/battery-electric vehicle lane in each direction, a new Highway 11 interchange and replacement of the Peardonville Road crossing.

Meanwhile, phase 3A along 13km of the Trans-Canada will cost around $1.71 billion. The entire 21km Highway 1 phase 3 improvement segment will now cost $3.65 billion.

The Trans-Canada Highway is a federal–provincial highway system that runs nearly 7,500km from the Pacific to Atlantic coasts, through all 10 provinces - one of the longest routes of its type in the world. However, unlike Interstate highways in the US, the Trans-Canada has no national construction standard. Most of it was built as a two-lane highway with few multi-lane freeway sections and standards vary considerably among provinces and cities.
 

Related Content

  • Teams shortlisted for Pattullo Bridge replacement near Vancouver
    March 1, 2019
    The Canadian province of British Columbia has shortlisted three consortia to design and build a US$1.06 billion Pattullo Bridge replacement near Vancouver. Fraser Community Connectors is led by Kiewit Canada Development. Kiewet Infrastructure BC is the design-build contractor. The long-span bridge design contractors are T.Y. Lin International and International Bridge Technologies. A joint venture of Flatiron Constructors, Dragados Canada and Carlson Construction Pattullo includes ACS Infrastructure Ca
  • BC again eyes Massey Tunnel replacement
    December 21, 2020
    The aging 61-year-old Canadian tunnel is about 30km north of the US state of Washington.
  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • British Columbia issues RFQ for US$2.7 billion Massey Bridge
    June 30, 2016
    Canada’s provincial British Columbia government has issued a request for qualification for construction of a US$2.7 billion bridge over the Fraser River around the city of Vancouver. The 10-lane bridge will be built under a 30-year public-private partnership agreement and will include tolled transit lanes and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day an