Skip to main content

Montreal to expand bus rapid transit on Pie-IX Boulevard

The Canadian province of Quebec tendered this month for expansion of the Pie-IX Boulevard bus rapid transit system between the cities of Laval and Montreal. The provincial government will contribute US$304 million out of which around $23 million will be for 28 new buses, according to the Canadian Broadcasting Corporation. Construction of the 11km stretch could start by October with completion in 2022. Pie-IX Boulevard, named after Pius IX, a Catholic pope, is a major thoroughfare on the island of M
June 5, 2018 Read time: 1 min
The Canadian province of Quebec tendered this month for expansion of the Pie-IX Boulevard bus rapid transit system between the cities of Laval and Montreal.


The provincial government will contribute US$304 million out of which around $23 million will be for 28 new buses, according to the Canadian Broadcasting Corporation.

Construction of the 11km stretch could start by October with completion in 2022.

Pie-IX Boulevard, named after Pius IX, a Catholic pope, is a major thoroughfare on the island of Montreal, passing the Montreal Botanical Gardens and the Olympic Stadium. The boulevard forms part of Quebec Route 125 and hosts the Pie-IX metro station.

Before 2002, the boulevard hosted Montreal’s only bus rapid transit line and which used contra-circulating lanes and dedicated bus stations. The Montréal-Nord commuter rail station is also located on Pie-IX Boulevard.

Related Content

  • US land sale completed for US-Canada Gordie Howe Bridge
    June 27, 2017
    Detroit has reached an agreement with the state to sell land, assets and some streets as part of a second bridge between Windsor and Detroit.
  • Colombian highway projects under development
    June 29, 2018
    A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km
  • Late delivery for Lagos to Ibadan highway upgrade
    November 22, 2018
    Completion of the Lagos to Ibadan highway upgrade in Nigeria will not occur until 2021. The improvement work was initially to have been delivered by 2017. However a string of delays to the work have resulted from insufficient funds and from contractors leaving the jobsite. The current Nigerian Government has now cleared the debts for the project. Around 50% of the highway upgrade has been carried out so far. The contractor Reynolds Construction Company is working on a section from the Sagamu Interchange to
  • Pearl Harbor Memorial Bridge, an extradosed design, opens in Connecticut
    September 30, 2015
    The first extradosed designed bridge in the United States, the Pearl Harbor Memorial Bridge in New Haven, Connecticut, was opened to traffic on September 28.