Skip to main content

Mexico opens Escenica Alterna Tunnel in Acapulco

The first stage of the 3.3km Escenica Alterna Tunnel in Acapulco was opened this month. The three-lane tunnel – one is reversible – is costing around US$62 million and will improve connections between coastal areas and Diamante zone, as well as access to Acapulco International Airport. Gerardo Ruiz Esparza, Secretary of Communication and Transport, said that the project would be concluded in June with construction of Cayaco-Diamante elevated road. The project is funded by the National Infrastructure F
April 18, 2017 Read time: 1 min
The first stage of the 3.3km Escenica Alterna Tunnel in Acapulco was opened this month.

The three-lane tunnel – one is reversible – is costing around US$62 million and will improve connections between coastal areas and Diamante zone, as well as access to Acapulco International Airport.

Gerardo Ruiz Esparza, Secretary of Communication and Transport, said that the project would be concluded in June with construction of Cayaco-Diamante elevated road. The project is funded by the National Infrastructure Fund and money from main contractor IDEAL, part of Grupo Carso.

Related Content

  • Government to invest in second stage of the Mexico-Veracruz motorway
    August 4, 2015
    The Mexican Secretariat of Communications and Transport has allocated around US$615 million to complete construction of the second level of Mexico-Veracruz motorway. Works, which is ongoing along the 13.3km stretch, will be concluded by July 2016. The motorway will reinforce the connection between Veracruz port and the industrial areas of Puebla and Mexico states. Last month, the Secretariat confirmed that 80% of the projects included in the national infrastructure plan (PNI) between 2014 and 2018 are
  • CPB, John Holland take Western Harbour work
    January 24, 2022
    The deal is a modification to the larger Rozelle Interchange contract in Sydney, Australia, all part of the WestConnex project.
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 22, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel.
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 21, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel t