Skip to main content

Massey Tunnel project to be Design-Build-Finance-Operate-Maintain

The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.
January 25, 2016 Read time: 3 mins
The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel.

The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.

The 10-lane bridge will be the province's longest and feature a high-occupancy vehicle as well as cycle and pedestrian paths. Upgrades to the highway will include new interchanges on Westminster Highway, Highway 17A and Steveston Road.

A spokesperson for the provincial government’s George Massey Tunnel Replacement Project told World Highways that a tender for the bridge – still not officially named - will go out by the end of the first half this year with construction to start in 2017. Completion is expected in 2022 when it will replace the tunnel, directly below it.

Extensive renovations to the tunnel and attempts to improve access roads have been done over the years, but only about 10 years of life is left in the tunnel itself. It will be closed due to the increasingly high cost of maintaining the structure that was opened in 1959 and also because it fails to meet the latest seismic requirements. Canada’s west coast is along the 1,000km Cascadia fault that stretches from Northern Vancouver Island to Cape Mendocino in northern California.

“The length of the concession has yet to be determined,” she said. “The province intends to fund the George Massey Tunnel replacement project through user tolls managed through Transportation Investment Corporation.”

Transportation Investment Corporation (TI Corp) is the public sector corporation responsible for toll operations on the recently opened Port Mann Bridge and construction of the Port Mann/Highway 1 Improvement Project. TI Corp manages TReO, the all-electronic toll system on the Port Mann Bridge to pay for project construction and the operation and maintenance of 37km of improvements on Highway 1.
 
So far the falling Canadian dollar against the US dollar has not affected the project, three years in the making. In January 2015 the Canadian dollar was worth around 82 US cents. This month the dollar has been trading at around 70 US cents.

“The project team continues to monitor world economic changes to assess any potential impacts to the business case,” the spokesperson said.

Related Content

  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • Montreal’s Champlain Bridge opens but late and over-budget
    June 27, 2019
    Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord
  • California turns towards a Texas solution for u-turn design
    July 24, 2019
    The first so-called Texas U-Turn in the US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach. The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island. The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables ve
  • Nova Scotia sets road budget for 2019-20 at US$224 million
    December 20, 2018
    The Canadian province of Nova Scotia will get US$224 million for road upgrades in 2019-20, a boost of $11.2 million over the current period. Lloyd Hines, the province’s transportation and infrastructure renewal minister, said much of the additional funding will be for twinning portions of the province’s 100 series highways, including the 101, 103, 104 and the 107 Sackville-Burnside connector. The plan includes rebuilding and upgrading gravel roads and around $15 million of the money has been earmarked