Skip to main content

Malaysia hopes Pan Borneo Highway will boost Borneo’s economy

Malaysian prime minister Datuk Seri Najib Tun Razak said the toll-free Pan Borneo highway should trigger economic growth in Sarawak state which has been held back by the lack of a good road network. Razak was speaking at the signing of a memorandum of understanding between federal government officials, officials from the state of Sarawak and infrastructure company Lebuhraya Borneo Utara Sdn. The event took place in the federal administrative capital Putrajaya, around 25km from the capital city Kuala L
July 2, 2015 Read time: 2 mins
Malaysian prime minister Datuk Seri Najib Tun Razak said the toll-free Pan Borneo highway should trigger economic growth in Sarawak state which has been held back by the lack of a good road network.

Razak was speaking at the signing of a memorandum of understanding between federal government officials, officials from the state of Sarawak and infrastructure company Lebuhraya Borneo Utara Sdn.

The event took place in the federal administrative capital Putrajaya, around 25km from the capital city Kuala Lumpur on mainland Malaysia, the Malaysian news agency Bernama reported.

"It is my dream to see balanced development and a reduction in the development gap among peninsular Malaysia, Sabah and Sarawak become a reality," he said in his latest post on his blog, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.najibrazak.com Visit najib razak website false http://www.najibrazak.com/ false false%>.

Work on the government-funded project recently started on a section of the highway on the island of Borneo, south of the Malaysian peninsula.

The whole Pan Borneo Highway, to be built at a capped cost of US$7.14 billion, involves the construction and upgrading of around 2,240km of road in the states of Sarawak and Sabah in the northern section of Borneo. Included in the project is road works through the coastal kingdom of Brunei, which is surrounded by Malaysian territory. The southern part of the island belongs to Indonesia.

Around 940km of the highway is in Sarawak and 730 in Sabah. Most of the highway will follow an existing trunk road or be upgrades of sections of the route from two lanes to four.

The current project in Sarawak involves the construction of 919km of a single carriageway from Tanjung Datu to Sematan and a dual carriageway from Sematan to Merapok.

Controversy has surrounded the appointment of Lebuhraya Borneo Utara, which is based on mainland Malaysia, to oversee the project expected to be finished in 2023.

The Sabah and Sarawak state parliaments were disappointed earlier this year when the federal government appointed Lebuhraya Borneo Utara as project manager but did so without a tender, according to some media reports. Politicians on Borneo want to see a federal commitment to hiring Borneo-based construction companies.

Related Content

  • Key highway link investment in Malaysia will boost connectivity
    April 13, 2012
    A US$137.6 million investment is being targeted at the Pan Borneo Highway connecting the Malaysian states of Sarawak and Sabah. This investment will be supplied by Malaysia’s Federal Government. Overtaking lanes will be built at critical locations along the 207km stretch linking Bintulu and Miri as well as the 217km stretch connecting Bintulu and Sibu.
  • Major tunnel project planned for Malaysia
    March 4, 2013
    A large tunnel project is being planned for Malaysia’s Penang State. This project has been awarded to a joint venture, Consortium Zenith, formed by Chinese and Malaysian partners. The 6.5km Gurney Drive-Bagan Ajam undersea tunnel will form the centrepiece of the project. However the work will also include the construction of a 12km road connecting Tanjung Bungah with Teluk Bahang, the 4.6km Lebuhraya Tun Dr Lim Chong Eu-Bandar Baru Air Itam bypass and the 4.2km Gurney Drive-Lebuhraya Tun Dr Lim Chong Eu byp
  • Faster than a speeding cow – your local bus maybe?
    May 22, 2015
    A methane-powered bus has set a speed record for a regular city bus of nearly 124km/h at a test track in the UK, according to media reports. The bus, from the southern city of Reading, was converted to run on compressed methane from cow manure and was painted black and white like a Friesian cow. Mechanics removed the bus’s engine governor that restricted the vehicle’s speed to 90km/h. The bus then broke the record on the banked high-speed circuit at Millbrook Proving Ground, near the city of Bedford.
  • NDT sensor fusion in structural pavement condition surveys
    February 27, 2017
    Early detection of pavement defects and the causes of deterioration is essential for effective maintenance planning, writes Dr Alena Uus* There is a need for optimisation and development of UK highway survey methods that would provide comprehensive information on the surface and subsurface pavement condition and operate at traffic speed, which eliminates the requirement for lane closures. Performance of non-destructive testing (NDT) methods commonly employed in pavement condition surveys can be potent