Skip to main content

Major German road contract awarded

A major road contract has been awarded close to Hesse in Germany.
By MJ Woof September 2, 2020 Read time: 2 mins
STRABAG is one of the partners in a major project in Hesse, Germany – image © courtesy of STRABAG

The contract for a major road project in Germany has been awarded for the A49 highway. The work will be carried out under the PPP model and is located close to Hesse.

The project is a design-build-finance-operate-maintain contract for A49 highway between Fritzlar and Ohmtal interchange. This 62km deal will be handled jointly by STRABAG Großprojekte and LEONHARD WEISS to close the gap between Schwalmstadt and the Ohmtal interchange

The project has a value of over € 700 million. The deal is for the construction of a 31km long section of the A49 highway between Schwalmstadt and the Ohmtal interchange in northern and central Hesse. The PPP project also includes the design and proportionate financing as well as the maintenance and operation of the motorway over a distance of nearly 62km between the Fritzlar junction and the Ohmtal A5/A49 interchange.

The client is the Federal Republic of Germany, represented by the State of Hesse, represented by Deutsche Einheit Fernstraßenplanungs- und -bau (DEGES). The consortium A 49 Autobahngesellschaft has been established for the project and is held 50:50 between STRABAG Infrastrukturprojekt and Meridiam Investments SAS. The PPP contract is for a 30-year concession.

Financing has been provided by the KfW IPEX-Bank (Germany), the European Investment Bank (EIB), MEAG (Germany) and ČSOB (Czech Republic, part of the Belgian KBC Group). In all the project will cost around €1.3 billion.

“We are pleased about the renewed trust in our ability to successfully realise large infrastructure projects in public-private partnerships, something we are already demonstrating in Germany with the A8 and A5 motorways,” said Thomas Birtel, CEO of STRABAG.

The A49 between Fritzlar and the Ohmtal interchange is divided into four sections. The first section to the Neuental junction is already open to traffic. The second section to the Schwalmstadt junction is currently under construction by HessenMobil. Realisation of the new sections three and four, from Schwalmstadt over the Stadtallendorf-Nord junction to the Ohmtal interchange, should begin in September 2020. The contract includes upgrading the A5 along a 1.5km section at the Ohmtal intersection. The main construction works are scheduled for completion in the third quarter of 2024.

For more information on companies in this article

Related Content

  • Success of toll road operators' conference
    July 12, 2012
    The 37th ASECAP Annual Study and Information Days held in Krakow, Poland, gathered some 300 road transport CEOs, experts and government decision-makers making the event "a huge success." Patrick Smith reports Toll road operators from across Europe have met to discuss the state of their businesses in the current economic climate and how to tackle it. Fabrizio Palenzona, the outgoing President of ASECAP (the European professional Association of Operators of Toll Road Infrastructures) and president of AISCAT (
  • Polish projects provide transport plan
    September 19, 2014
    Poland is planning to enter seven transport projects to the Connecting Europe Programme, with these having a combined value close to €2.86 billion. Among the planned projects are the S61 express road between the Lithuanian border and Augustow. Meanwhile STRABAG and Budimex have formed a consortium that will construct a 41km stretch of the A4 highway in Poland. The section of the route runs from Rzeszów to Jarosław, in south-eastern Poland. The project is expected to take 14 months to complete and the contra
  • Bidding for Uganda road connecting Kampala and Jinja
    May 22, 2018
    In Uganda bidding is now underway for the new expressway project to improve transport between capital Kampala and the industrial city of Jinja. The project for the 95km section of road is expected to cost US$1 billion to construct. The contract is being offered under the design, finance, build and operate model, with the route then being handed back to the Ugandan Government once the agreed concession period is complete. Some of the financing will be provided by the Africa Development Bank (AfDB), French De
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill